• You can log in to your eeworld account to continue watching:
  • multi-segment cubic polynomials
  • Login
  • Duration:21 minutes and 41 seconds
  • Date:2019/03/20
  • Uploader:老白菜
Introduction

This course mainly explains the kinematics and trajectory planning of the robotic arm in the analysis plane.
Learning objectives:
1. Understand the description of the movement of objects in space
2. Understand the forward and inverse kinematics of multi-joint robotic arms
3. Understand the planning method of motion trajectories


Unfold ↓

You Might Like

Recommended Posts

I want a master to look at the circuit diagram of the X-ray machine and explain the circuit a little bit.
[i=s]This post was last edited by tangjc2001 on 2022-4-20 14:03[/i]Can anyone help explain this circuit diagram?
tangjc2001 Analog electronics
Differences between two-phase and five-phase stepper motors
[b]Overview:[/b]Stepper motors are mainly classified by the number of phases, and two-phase and five-phase stepper motors are the most widely used in the market. A two-phase stepper motor can be divid
锐特0087 Industrial Control Electronics
Where to study in college? (Intended to study electronic information engineering and communication engineering)
[size=14px]I am a candidate from Liaoning, my home is in Dashiqiao. There is only one day left before the application deadline. I am undecided about two schools. One is Hubei University of Science and
S66D Talking
Development of a Current-Source DC/DC Converter
Source: Communication Power TechnologyAuthor: Ju Zhizhong, Ren Jilin, etc. 1 IntroductionSwitching converters usually use two control modes: voltage-type and current-type [1]. Voltage-type controllers
fighting Analog electronics
A pit of STM32 standard USB library (V2.2.1)
Recently, I debugged the STM32F205USB communication and used two USBs of F205 , one HS and one FS. However, both used HS, and both acted as USB hosts to connect other USB peripherals. After debugging
29447945 stm32/stm8
Preparation and debugging of electromagnetic flowmeter before operation
[color=#333333][size=14px]Like ordinary instruments, after the electromagnetic flowmeter is installed and wired, before it is officially put into operation, you should check whether the following inst
窗外的麻雀 Test/Measurement

Recommended Content

Hot VideosMore

可能感兴趣器件

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京B2-20211791 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号