I was bored at work, so I tried to make a control system to meet some of my on-site control needs.

Scenario 1: Cluster control of central air conditioners, realizing cloud monitoring and policy control through WIFI. Stabilize the temperature and humidity in the workshop, electrical control room and office space, achieve energy saving and consumption reduction, and realize automatic management of equipment failure warning and equipment maintenance strategies, reduce dependence on people, and improve the operation reliability of equipment.

 

Scenario 2: Intelligent control of the entire factory drainage system, classified control of daily drainage during heavy rains. To solve the problem of high failure rate of large pumps that frequently start and stop. During heavy rains and typhoons, water drainage is not timely. The entire water system is unbalanced, causing local waterlogging. The pumps in each area cannot be automatically deployed. The water system must be strategically balanced to ensure that the overall drainage does not cause excessive local drainage. big.

 

The hardware is only a basic underlying unit in the system, and more functions are based on the management program and data analysis program in the server. It will be slowly and gradually improved and established in the future. The OPC protocol is initially adopted as the data reporting mode.

参考设计图片
×
 
 
Search Datasheet?

Supported by EEWorld Datasheet

Forum More
Update:2024-11-22 12:28:50

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号