Installation requirements of electromagnetic flowmeter
1: The electromagnetic flow transmitter should be installed in a dry and ventilated place indoors. Avoid installing it in places where the ambient temperature is too high. It should not be subjected to strong vibrations and try to avoid equipment with strong magnetic fields, such as large motors, transformers, etc. Avoid installing it in places with corrosive gases. The installation location should be convenient for maintenance. This is the environmental condition to ensure the normal operation of the transmitter.
2: In order to ensure that the measuring tube of the electromagnetic flow transmitter is filled with the measured medium, the transmitter is best installed vertically, with the flow direction from bottom to top. Especially for liquid-solid two-phase flow, it must be installed vertically. If only horizontal installation is allowed on site, it must be ensured that the two electrodes are on the same horizontal plane.
3: Valves and bypasses should be installed at both ends of the electromagnetic flow transmitter.
4: The millivolt AC potential measured by the electrodes of the electromagnetic flow transmitter is based on the liquid potential in the transmitter. In order to stabilize the liquid potential and keep the transmitter and the fluid at the same potential to ensure stable measurement, the transmitter housing and both ends of the metal pipe should be well grounded, and the converter housing should also be grounded. The grounding resistance cannot be greater than 10, and it cannot be shared with the grounding wire of other electrical equipment. If it is not possible to ensure that the transmitter housing is in good contact with the metal pipe, use a metal wire to connect them and then reliably ground them.
5: In order to avoid interference signals, the signals between the transmitter and the converter must be transmitted with shielded wires. It is not allowed to place the signal cable and the power line in parallel in the same cable steel pipe. The length of the signal cable should generally not exceed 30m.
6: The installation location of the converter should avoid strong AC and DC magnetic fields and vibrations, the ambient temperature should be -20 to 50°C, it should not contain corrosive gases, and the relative humidity should not exceed 80%.
7: In order to avoid the influence of velocity distribution on measurement, the flow control valve should be set at the downstream of the transmitter. For small-diameter transmitters, since the distance from the electrode center to the inlet of the flowmeter is equivalent to several times the length of the diameter D, there is no requirement for the upstream straight pipe. However, for flowmeters with larger diameters, there should generally be a straight pipe section of more than 5D upstream, and there is generally no requirement for a straight pipe section downstream.
Previous article:Working principle and product features of liquid turbine flowmeter
Next article:Magnetic flowmeter installation location requirements and calibration methods
- Popular Resources
- Popular amplifiers
- Seizing the Opportunities in the Chinese Application Market: NI's Challenges and Answers
- Tektronix Launches Breakthrough Power Measurement Tools to Accelerate Innovation as Global Electrification Accelerates
- Not all oscilloscopes are created equal: Why ADCs and low noise floor matter
- Enable TekHSI high-speed interface function to accelerate the remote transmission of waveform data
- How to measure the quality of soft start thyristor
- How to use a multimeter to judge whether a soft starter is good or bad
- What are the advantages and disadvantages of non-contact temperature sensors?
- In what situations are non-contact temperature sensors widely used?
- How non-contact temperature sensors measure internal temperature
- LED chemical incompatibility test to see which chemicals LEDs can be used with
- Application of ARM9 hardware coprocessor on WinCE embedded motherboard
- What are the key points for selecting rotor flowmeter?
- LM317 high power charger circuit
- A brief analysis of Embest's application and development of embedded medical devices
- Single-phase RC protection circuit
- stm32 PVD programmable voltage monitor
- Introduction and measurement of edge trigger and level trigger of 51 single chip microcomputer
- Improved design of Linux system software shell protection technology
- What to do if the ABB robot protection device stops
- Wi-Fi 8 specification is on the way: 2.4/5/6GHz triple-band operation
- Wi-Fi 8 specification is on the way: 2.4/5/6GHz triple-band operation
- Vietnam's chip packaging and testing business is growing, and supply-side fragmentation is splitting the market
- Vietnam's chip packaging and testing business is growing, and supply-side fragmentation is splitting the market
- Three steps to govern hybrid multicloud environments
- Three steps to govern hybrid multicloud environments
- Microchip Accelerates Real-Time Edge AI Deployment with NVIDIA Holoscan Platform
- Microchip Accelerates Real-Time Edge AI Deployment with NVIDIA Holoscan Platform
- Melexis launches ultra-low power automotive contactless micro-power switch chip
- Melexis launches ultra-low power automotive contactless micro-power switch chip
- Today is International Day Against Spatting. Were you ever spanked as a child?
- B&O Beoplay E8 TWS True Wireless Bluetooth Earphones
- Flyback switching power supply simulation using Saber
- Our company makes FOC motor drivers. The algorithm is mature. We want to find a chip manufacturer to cooperate with us to make a motor-specific chip.
- How to build a simple and efficient isolated power supply below 2W
- Six common circuit board surface treatment processes
- [RISC-V MCU CH32V103 Review] - 5: Failed to leave API and enter Assembly, returned to API......
- BQ76940 sampling chip damage issue
- [RVB2601 Creative Application Development] LoRa Gateway Wireless Host Computer
- There is a program with a total of 10 feeders