doc

Safety technical work regulations for water conservancy and hydropower construction installation

  • 2013-09-20
  • 142KB
  • Points it Requires : 1

Article 1.0.1 Personnel at all levels engaged in the production of sand and gravel (including apprentices, migrant workers and temporary workers) must comply with the relevant provisions of this regulation. Article 1.0.2 All work related to the construction site, site transportation, welding, blasting, air supply, water supply, power supply, etc. in production shall be carried out in accordance with the relevant provisions of other chapters of this regulation, and this chapter shall be omitted.

unfold

You Might Like

Uploader
电子爱好者IK
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×