Opening words:The book "Operational Amplifier Parameter Analysis and LTspice Application Simulation" took more than half a year to write, and the preparations for publication are now underway. The ori
2.4 GD32E503VET6 Performance Test2.4.1 Preliminary Analysis of IndicatorsWhen developing products using GD32E503, RD engineers will basically consider two indicators: power consumption and performance
1. bq34z100 current calibration problem:
1. In the current calibration section of the bq34z100EVM Wide Range Impedance Track Enabled Battery Fuel Gauge Solution manual, sentence 4: Connect and measure
LZ is in the second year of graduate school. Although his major is electronics, the application is awkward. It is in the direction of electronic readout for large-scale particle detection. With the ec
The WM signal is a digital signal with a fixed period and an indefinite duty cycle.If the counter of Timer_A works in the up-counting mode, the output adopts the output mode 7 (reset/set mode)to contr