Sineng Electric assisted the Dafang centralized energy storage demonstration project to be officially connected to the grid and put into operation

Publisher:NatureLoverLatest update time:2024-01-17 Source: 上能电气Author: Lemontree Reading articles on mobile phones Scan QR code
Read articles on your mobile phone anytime, anywhere

Recently, the Guizhou Dafang 150MW/300MWh centralized energy storage demonstration project was officially connected to the grid and put into operation. The project uses Sineng Electric's 1500V centralized energy storage converter and converter-boosting integrated machine, which will effectively promote the development of the local green economy and help the local clean energy transformation.

The project is located in Dafang County, Bijie City, Guizhou Province. The maximum daily temperature difference is up to 25°C, and the outdoor solar radiation intensity can reach 0.11W/cm². It has unique wind, light and water resources. In view of the local regional characteristics, Sineng Electric provides a full set of energy storage system solutions for the project.

The project uses 38 sets of Sineng Electric's 4MW centralized converter and booster integrated machines, which are composed of 75 2MW centralized energy storage converters. The machines have IP65 high protection and C3 high corrosion resistance. While operating reliably in the temperature range of -40 to 60°C, they can work stably at an altitude of up to 5,000 meters, regardless of strong winds, high temperature differences, high altitudes and other harsh outdoor environments. Safe, reliable and efficient energy supply, Sineng Electric relies on high-quality products and innovative technology research and development to protect the operation of power stations.

Reference address:Sineng Electric assisted the Dafang centralized energy storage demonstration project to be officially connected to the grid and put into operation

Previous article:A lithium iron phosphate energy storage battery project with a total investment of 5 billion yuan and an annual output of 16GW was launched in Taihu County
Next article:Vanadium Titanium Co., Ltd. and Dalian Rongke signed a 16,000-ton vanadium energy storage raw material cooperation agreement

Latest New Energy Articles
Change More Related Popular Components

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号