China Southern Power Grid "emergency power generation" to cope with peak power load

Publisher:zhuanshiLatest update time:2020-05-08 Source: 新华社Author: Lemontree Reading articles on mobile phones Scan QR code
Read articles on your mobile phone anytime, anywhere

China Energy Storage Network News: The reporter learned from China Southern Power Grid Company on the 8th that the power load in Guangdong, Guangxi and Hainan has reached a new high this year. The power department urgently mobilized units to generate electricity and arranged for projects to resume power in advance to increase power supply. At the same time, it temporarily canceled line maintenance to increase power transmission capacity.

According to China Southern Power Grid, as of 17:00 on the 7th, the peak loads in Guangdong, Guangxi and Hainan reached 107 million kilowatts, 23.33 million kilowatts and 5.04 million kilowatts respectively, all up more than 20% from the same period last year. Guangzhou, Shenzhen, Dongguan and Foshan also recorded the highest power loads this year, all exceeding 10 million kilowatts.

To ensure power supply, China Southern Power Grid Company urgently dispatched peak power generation from effective units in Guangdong Province to ease the pressure of tight power supply. On May 5 and 6, China Southern Power Grid made overall arrangements to dispatch 25 units with a total capacity of nearly 8 million kilowatts in Guangdong Province, adding 13.84 million kilowatts of coal-fired units and 3.29 million kilowatts of gas-fired units compared with before May 1.

At the same time, we optimized the maintenance strategy, completed the maintenance of key power transmission channels in Guangdong ahead of schedule, and restored power in time. We arranged for the Xindong DC project from Yunnan to Guangdong to restore power ahead of schedule, increasing the support capacity for Guangdong by 2.5 million kilowatts. We also canceled some maintenance of the main channel in Guangdong to improve the transmission channel capacity. Currently, Yunnan, Guizhou, and Guangxi are supporting Guangdong at their maximum capacity, and the power sent from the west to Guangdong has increased by nearly 9 million kilowatts compared to before May Day.

Apart from the high temperature factor, the increase in power load shows the strong momentum of economic development. Power consumption data show that the resumption rate of enterprises in Guangdong is over 85%, and the resumption rate of production is over 99%. The power consumption of the secondary industry exceeded the same period last year in April, and the power consumption of the tertiary industry is also recovering rapidly.

Reference address:China Southern Power Grid "emergency power generation" to cope with peak power load

Previous article:New infrastructure promotes the development of 5G and AI chips
Next article:Guangdong Power Grid Corporation's grid load exceeded 100 million kilowatts for the first time this year

Latest New Energy Articles
Change More Related Popular Components

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号