2. The following projects shall not be approved:
(1) The technical requirements are lower than those of the relevant mandatory national standards;
(2) The key technical requirements have not been fully verified and widely promoted;
(3) Only those with special needs in the administrative area of a city divided into districts;
(4) Similar standards already exist at the national, industrial or local level, and the application materials do not clarify the similarities and differences, the necessity is insufficient, or the application deliberately avoids the issue;
(5) The task of formulating and revising local standards undertaken by the project leader has not yet been completed;
(6) Products that have not obtained the geographical indication protection product announcement approved by the former General Administration of Quality Supervision, Inspection and Quarantine or the geographical indication certification trademark approved by the former State Administration for Industry and Commerce;
(7) Other items that do not meet the project establishment requirements.
(III) Carefully prepare the draft of the local standard. The draft of the local standard should include the following essential elements: the cover, foreword, scope, chapters of the standard (which should be specific to the articles, paragraphs or items; if there is no specific content, a brief description of the content or drafting concept can be given), etc. The draft of the standard should basically comply with the requirements of GB/T 1.1-2009.
(IV) Establish a standard drafting group. After the project plan is issued, the project undertaking unit should promptly organize relevant personnel to establish a standard drafting group, which generally consists of 5 to 15 people, with a reasonable professional structure and broad representation. Among them, the project leader should have a senior technical title or above or be an expert in the industry, and the number of project working group members with intermediate titles or above shall not be less than 50%.
IV. Requirements for submitting materials
(1) For projects submitted by provincial-level industry administrative departments and their directly affiliated institutions, the provincial-level industry administrative departments shall sign their opinions at the corresponding position of the "Shaanxi Provincial Local Standard (Revision) Project Application Form" and then summarize and submit them to the Provincial Market Supervision Bureau.
(2) For projects submitted by other units, the provincial industry administrative department must sign its opinion and stamp its official seal on the corresponding position of the "Shaanxi Provincial Local Standard Formulation (Revision) Project Application Form", and then submit the application materials to the Provincial Market Supervision Bureau, and submit one copy to the local municipal market supervision bureau at the same time.
(III) The deadline for this project solicitation is March 31, 2020. Each unit should submit the application documents, the draft local standards and the "Application for the Development (Revision) of Local Standards in Shaanxi Province" in duplicate with the official seal to the Provincial Market Supervision Bureau within the required period. At the same time, the draft local standards and the electronic text of the "Application for the Development (Revision) of Local Standards in Shaanxi Province" should be sent by e-mail to sxbzhc@126.com. The "Application for the Development (Revision) of Local Standards in Shaanxi Province" can be downloaded from the public notice column of snamr.shaanxi.gov.cn.
Previous article:PV inverter exports in November 2019: total shipments of 6.07GW, Huawei, Sungrow and Ginlong ranked top three in terms of export value
Next article:State Grid Zhangbei Flexible DC Grid Test Demonstration Project Completed
- Popular Resources
- Popular amplifiers
- Increase the proportion of capacity leasing! Ningxia issued a notice on promoting the healthy development of energy storage
- A brief discussion on the application of energy storage power stations in cement plants
- Indian Army uses hydrogen microgrid to supply electricity in Himalayas
- CATL's Xiaoyao super hybrid battery fully opens the era of hybrid "large capacity"
- Gansu's new energy storage installed capacity exceeds 4 million kilowatts
- Hebei Weixian 100MW/400MWh energy storage power station project with a total investment of 650 million yuan started
- The world's first pioneering technology! Chengdu East New District's first 10 billion-level leading project is fully operational
- Shandong publishes registration information of two virtual power plants, capable of regulating 14.625 MW of electricity
- Musk: Tesla's energy storage business 'growing like wildfire'
- Innolux's intelligent steer-by-wire solution makes cars smarter and safer
- 8051 MCU - Parity Check
- How to efficiently balance the sensitivity of tactile sensing interfaces
- What should I do if the servo motor shakes? What causes the servo motor to shake quickly?
- 【Brushless Motor】Analysis of three-phase BLDC motor and sharing of two popular development boards
- Midea Industrial Technology's subsidiaries Clou Electronics and Hekang New Energy jointly appeared at the Munich Battery Energy Storage Exhibition and Solar Energy Exhibition
- Guoxin Sichen | Application of ferroelectric memory PB85RS2MC in power battery management, with a capacity of 2M
- Analysis of common faults of frequency converter
- In a head-on competition with Qualcomm, what kind of cockpit products has Intel come up with?
- Dalian Rongke's all-vanadium liquid flow battery energy storage equipment industrialization project has entered the sprint stage before production
- Allegro MicroSystems Introduces Advanced Magnetic and Inductive Position Sensing Solutions at Electronica 2024
- Car key in the left hand, liveness detection radar in the right hand, UWB is imperative for cars!
- After a decade of rapid development, domestic CIS has entered the market
- Aegis Dagger Battery + Thor EM-i Super Hybrid, Geely New Energy has thrown out two "king bombs"
- A brief discussion on functional safety - fault, error, and failure
- In the smart car 2.0 cycle, these core industry chains are facing major opportunities!
- The United States and Japan are developing new batteries. CATL faces challenges? How should China's new energy battery industry respond?
- Murata launches high-precision 6-axis inertial sensor for automobiles
- Ford patents pre-charge alarm to help save costs and respond to emergencies
- New real-time microcontroller system from Texas Instruments enables smarter processing in automotive and industrial applications
- GD32e231 ADC acquisition
- A preliminary study of k210 - MixNo - graphical programming
- 【i.MX6ULL】Driver Development 6——Pinctrl subsystem and GPIO subsystem light up LED
- Audi A6 computer version internal structure analysis, please come and teach me
- Excellent Works of the National College Student Electronic Design Competition - Smart Car Album
- Tektronix RF Communication Laboratory Innovation Experiment Platform
- What is the use of the C language comments in the figure?
- IoT Protocol: MQTT Protocol
- The Development and Application of Wireless Video Surveillance
- [The Big Secret of the Internet of Things Factory] How are circuit boards and data transmission modules produced?