The measurement principle of the split electromagnetic flowmeter is based on Faraday's law of electromagnetic induction. The split electromagnetic flowmeter consists of a sensor and a converter. The sensor is installed on the measuring pipe, and the converter is installed within 30 meters or 100 meters from the sensor. The two are connected by a shielded signal cable. The main components of the sensor are: measuring tube, electrode, excitation coil, iron core and yoke housing. The split electromagnetic flowmeter is mainly used to measure the volume flow of conductive liquids and slurries in closed pipes. Such as water, sewage, mud, pulp, various acids, alkalis, salt solutions, food slurries, etc., are widely used in petroleum, chemical, metallurgy, textile, food, pharmaceutical, papermaking and other industries as well as environmental protection, municipal management, water conservancy construction and other fields to measure high temperature, high humidity, and inconvenient observation environments.
The installation position of the split electromagnetic flowmeter should be far away from the disturbance source that can cause mechanical vibration of the pipeline, such as the pump on the technical pipeline. If the split electromagnetic flowmeter is used in series on the same pipeline, the mutual influence caused by resonance should be avoided. The distance between the split electromagnetic flowmeters should be at least three times greater than the width of the split electromagnetic flowmeter's overall dimensions. If installed near the expansion joint, the elasticity of the pipeline will cause lateral stress, causing the zero point of the split electromagnetic flowmeter to change, affecting the measurement accuracy. The installation position of the split electromagnetic flowmeter should pay attention to the elasticity and deformation of the technical pipeline caused by temperature changes, and it should not be installed near the expansion joint of the technical pipeline.
The installation position of the split electromagnetic flowmeter should be far away from industrial electromagnetic interference sources, such as high-power motors, transformers , etc. Otherwise, the self-resonant vibration of the measuring tube in the split electromagnetic flowmeter will be disturbed, and the weak signal detected by the split electromagnetic flowmeter may be submerged in the noise of electromagnetic interference. The split electromagnetic flowmeter should be at least 5 meters away from transformers and motors. The installation position of the split electromagnetic flowmeter should ensure that the fluid in the pipeline is always full of the split electromagnetic flowmeter measuring tube, and there is a certain pressure, which requires the installation position to be at the lower end of the pipeline.
Previous article:What are the interference factors of split electromagnetic flowmeter?
Next article:What are the key points for installing electromagnetic flowmeter?
- Keysight Technologies Helps Samsung Electronics Successfully Validate FiRa® 2.0 Safe Distance Measurement Test Case
- From probes to power supplies, Tektronix is leading the way in comprehensive innovation in power electronics testing
- Seizing the Opportunities in the Chinese Application Market: NI's Challenges and Answers
- Tektronix Launches Breakthrough Power Measurement Tools to Accelerate Innovation as Global Electrification Accelerates
- Not all oscilloscopes are created equal: Why ADCs and low noise floor matter
- Enable TekHSI high-speed interface function to accelerate the remote transmission of waveform data
- How to measure the quality of soft start thyristor
- How to use a multimeter to judge whether a soft starter is good or bad
- What are the advantages and disadvantages of non-contact temperature sensors?
- Innolux's intelligent steer-by-wire solution makes cars smarter and safer
- 8051 MCU - Parity Check
- How to efficiently balance the sensitivity of tactile sensing interfaces
- What should I do if the servo motor shakes? What causes the servo motor to shake quickly?
- 【Brushless Motor】Analysis of three-phase BLDC motor and sharing of two popular development boards
- Midea Industrial Technology's subsidiaries Clou Electronics and Hekang New Energy jointly appeared at the Munich Battery Energy Storage Exhibition and Solar Energy Exhibition
- Guoxin Sichen | Application of ferroelectric memory PB85RS2MC in power battery management, with a capacity of 2M
- Analysis of common faults of frequency converter
- In a head-on competition with Qualcomm, what kind of cockpit products has Intel come up with?
- Dalian Rongke's all-vanadium liquid flow battery energy storage equipment industrialization project has entered the sprint stage before production
- Allegro MicroSystems Introduces Advanced Magnetic and Inductive Position Sensing Solutions at Electronica 2024
- Car key in the left hand, liveness detection radar in the right hand, UWB is imperative for cars!
- After a decade of rapid development, domestic CIS has entered the market
- Aegis Dagger Battery + Thor EM-i Super Hybrid, Geely New Energy has thrown out two "king bombs"
- A brief discussion on functional safety - fault, error, and failure
- In the smart car 2.0 cycle, these core industry chains are facing major opportunities!
- The United States and Japan are developing new batteries. CATL faces challenges? How should China's new energy battery industry respond?
- Murata launches high-precision 6-axis inertial sensor for automobiles
- Ford patents pre-charge alarm to help save costs and respond to emergencies
- New real-time microcontroller system from Texas Instruments enables smarter processing in automotive and industrial applications