You should have a certain understanding of the installation method of the V-cone flowmeter. I believe that you will have a comprehensive understanding of the connection method of the V-cone flowmeter. However, during the installation of the V-cone flowmeter, have you ever thought about the requirements of the V-cone flowmeter for the installation site? Let's follow the experts of China Sensor Trading Network to learn some relevant knowledge.
The V-cone flowmeter has a conical cutoff piece suspended in the center of the pipeline. The conical piece hinders the flow of the medium and reshapes the flow velocity curve. The measured media include water, steam, air, natural gas, nitrogen, coke oven gas and organic gas.
Usually the protection level of the V-cone flowmeter sensor housing is IP65, and the installation site requirements are:
1. Choose a place with low vibration, especially for integrated instruments;
2. When measuring mixed phase fluids, choose a location that will not cause phase separation; when measuring two-component liquids, avoid installing it downstream where the mixture is not yet uniform; when measuring chemical reaction pipelines, install it downstream of the reaction section where the reaction is fully completed;
3. Avoid negative pressure in the measuring tube as much as possible;
4. The relative humidity of the environment is within the range of 10% to 90%;
5. Avoid direct sunlight as much as possible;
6. Avoid rain and will not be submerged in water.
7. Avoid large motors, large transformers , etc. nearby to avoid electromagnetic interference;
8. A place where it is easy to achieve separate grounding of the sensor;
9. Avoid high concentration of corrosive gas in the surrounding environment as much as possible;
10. The ambient temperature is within the range of -25/-10~50/60℃. The temperature of the integrated structure is also subject to the electronic components, so the range is narrower.
11. If the protection level of the V-cone flowmeter is IP67 or IP68, the above requirements 8 and 10 are not required.
The basic requirements of the V-cone flowmeter for the installation site are mainly reflected in these aspects. I believe that as everyone masters the installation skills of the V-cone flowmeter , they will be able to install the V-cone flowmeter correctly.
Previous article:Precautions during the installation of metal tube float flowmeter
Next article:Working principle and main features of V-cone flowmeter
- Popular Resources
- Popular amplifiers
- From probes to power supplies, Tektronix is leading the way in comprehensive innovation in power electronics testing
- Seizing the Opportunities in the Chinese Application Market: NI's Challenges and Answers
- Tektronix Launches Breakthrough Power Measurement Tools to Accelerate Innovation as Global Electrification Accelerates
- Not all oscilloscopes are created equal: Why ADCs and low noise floor matter
- Enable TekHSI high-speed interface function to accelerate the remote transmission of waveform data
- How to measure the quality of soft start thyristor
- How to use a multimeter to judge whether a soft starter is good or bad
- What are the advantages and disadvantages of non-contact temperature sensors?
- In what situations are non-contact temperature sensors widely used?
- LED chemical incompatibility test to see which chemicals LEDs can be used with
- Application of ARM9 hardware coprocessor on WinCE embedded motherboard
- What are the key points for selecting rotor flowmeter?
- LM317 high power charger circuit
- A brief analysis of Embest's application and development of embedded medical devices
- Single-phase RC protection circuit
- stm32 PVD programmable voltage monitor
- Introduction and measurement of edge trigger and level trigger of 51 single chip microcomputer
- Improved design of Linux system software shell protection technology
- What to do if the ABB robot protection device stops
- Learn ARM development(19)
- Learn ARM development(14)
- Learn ARM development(15)
- Analysis of the application of several common contact parts in high-voltage connectors of new energy vehicles
- Wiring harness durability test and contact voltage drop test method
- From probes to power supplies, Tektronix is leading the way in comprehensive innovation in power electronics testing
- From probes to power supplies, Tektronix is leading the way in comprehensive innovation in power electronics testing
- Sn-doped CuO nanostructure-based ethanol gas sensor for real-time drunk driving detection in vehicles
- Design considerations for automotive battery wiring harness
- Do you know all the various motors commonly used in automotive electronics?
- Choosing the right GaN power amplifier - the design is so simple
- The Perseverance rover landed on Mars. Let’s talk about how demanding space is on equipment.
- Infineon Angle Sensor Application Unlocking Machine See how many you can find? Good gifts are waiting for you!
- FPGA experience talk (Xi'an Datang Telecom).pdf
- EEWORLD University ---- ST MEMS sensor application demonstration video
- Analog Discovery 2 review
- What is the purpose of connecting a 10uF capacitor after the op amp output?
- Who needs WiFi 7?
- 【GD32E230】 EVAL board project creation and lighting
- Composting Fermentation Control Based on GD32E231