Intelligent dispatching of large power grid operation after renewable energy generation is connected to the grid

  • 2013-12-06
  • 4.21MB
  • Points it Requires : 1

        With the grid connection of renewable energy such as wind power and the implementation of demand response, the uncertainties in the balanced and stable operation of the power system have increased significantly. To cope with these uncertainties, the dispatching system of regional transmission organizations (RTOs) or large power grid companies needs to have stronger advance prediction capabilities based on traditional real-time monitoring. A new dispatching system, Generation Control Application (GCA), is proposed to meet the challenges brought by the grid connection of renewable energy. With dynamic and robust dispatching algorithms and flexible system configuration, this system enables the dispatching system to ensure that the power system has sufficient tracking capabilities to cope with the uncertainty and intermittency of renewable energy and ensure the reliability of large power grid operation.

unfold

You Might Like

Uploader
huhuhah0009
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×