doc

Analysis of a hydropower plant generator demagnetization and overspeed accident

  • 2013-09-19
  • 32KB
  • Points it Requires : 2

Before the accident, the No. 2 unit (rated capacity 65 MW) of a hydropower plant had an active power of 64 MW and a reactive power of 110 Mvar. According to the needs of equipment maintenance on that day, the operator switched the 400 V I section of the power supply to the III section. According to the plant operation procedures, the 400 V I section of the power supply switch for the power supply should be disconnected first, and the 400 V III section contact switch should automatically supply power by relying on the automatic standby power supply device (BZT). After the operator (under the supervision of the guardian) disconnected the 400 V I section of the power supply switch for the power supply in the 400 V distribution room, he immediately found that the 400 V III section BZT did not operate, so he manually closed the III section contact switch 4ZKK.

unfold

You Might Like

Uploader
huhuhah0009
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×