Output or reference voltage temperature coefficients defined as the worst case voltage change divided by the total temperature range.
Note 2:
Unless otherwise specified all limits guaranteed for T
J
= 25°C, V
IN
= 6V, I
L
= 100
μA
and C
L
= 1μF. Additional conditions for the 8-pin versions are feedback
tied to 5V tap and output tied to output sense (V
OUT
= 5V) and V
SHUTDOWN
≤0.8V.
Note 3:
Regulation is measured at constant junction temperature, using pulse testing with a low duty cycle. Changes i n output voltage due to heating effects are
covered under the specification for thermal regulation.
Note 4:
Line regulation for the LP2951 is tested at I
L
= 1mA. For I
L
= 100
μA
and T
J
= 125°C, line regulation is guaranteed by design to 0.2%. See typical
performance characteristics for line regulation versus temperature and load current.
Note 5:
Dropout voltage is defined as the input to output differential at which the output voltage drops 100 mV below its nominal value measured at 1V differential. At
very low values of programmed output voltage, the minimum input supply voltage of 2V (2.3V over temperature) must be taken into account.
Note 6:
V
REF
≤V
OUT
≤(V
IN
- 1V), 2.3
≤V
IN
≤30V,
100μA≤I
L
≤100mA,
T
J
≤T
JMAX
.
Note 7:
Comparator thresholds are expressed in terms of a voltage differential at the feedback terminal below the nomi nal reference voltage measured at 6V input. To
express these thresholds in terms of output voltage change, multiply by the error amplifier gain = V
OUT
/V
REF
= (R
1
+ R
2
)/R
2
. For example, at a programmed output
voltage of 5V, the error output is guaranteed to go low when the output drops by 95 mV x 5V/1.235 = 384 mV. Thresholds remain constant as a percent of V
OUT
as V
OUT
is varied, with the dropout warning occurring at typically 5% below nominal, 7.5% guaranteed.
Note 8:
V
SHUTDOWN
≥2V,
V
IN
≤30V,
V
OUT
=0, Feedback pin tied to 5V Tap.
Note 9:
All typical values are not guaranteed. The value could vary from lot to lot.
TI|Pain Point Unlocker: We understand your power supply design pain points! Unlock and comment to win gifts!Click here to enter the eventFor those who have just started working or want to engage in po...
This is what the PCB looks like once the copper is applied. All the wires are connected.
The board is full of crosses, and there is no one online. Xiaobai begs for help....
Under the premise that the current can be satisfied, Darlington and MOS can both meet the requirements, but how to choose? Under the condition of the same driving capability, the price of MOS is defin...
The process of burning JIC is actually divided into two steps.The first step is to use the JTAG mode to burn a FLASH Loader firmware into the FPGA;the second step is to use the FLASH Loader firmware t...
On November 26, the Zhuhe City Multifunctional Smart Energy Complex located in the Zhengding area of the China (Hebei) Pilot Free Trade Zone was put into operation. This is an urban energy comple...[Details]
This article briefly discusses the three major electric components in pure electric vehicles, namely the common functions and technical points of the vehicle control unit (VCU), battery management sy...[Details]
Recently, NavInfo passed the highest level 3 assessment of TISAX (Trusted Information Security Assessment Exchange), further enhancing its ability to provide products and services to upstream and dow...[Details]
TSMC did not comment on market rumors yesterday (26). The supply chain revealed that if the factories in the United States and Japan are also targeting the automotive chip business opportunities, it ...[Details]
1. Explanation of some common English abbreviations in ARM MSB: most significant bit; LSB: least significant bit; AHB: Advanced High-Performance Bus; VPB: VLSI peripheral bus that connects on-chip an...[Details]
GM's Chevrolet Bolt electric hatchback has a safety hazard, with at least five Bolts catching fire while parked. According to foreign media reports, GM engineers have now found a way to solve the bat...[Details]
How does the 34970/72A data acquisition system maximize test speed? Take DC measurement as an example to set the fastest test speed of the data acquisition system. Turn off the display. Turn off au...[Details]
In order to ensure the stable and reliable operation of the circuit in the microcomputer system, the reset circuit is an indispensable part. The first function of the reset circuit is power-on rese...[Details]
This article introduces how to use the mainboard terminal functions and protection functions of the PUCHAN PI7000 vector control inverter to achieve the low-frequency and high-torque of hybrid elec...[Details]
Abstract: In order to meet the test requirements of high-power integrated circuits, this paper gives a design method of a voltage and current source with high-power load driving capability and a hi...[Details]
Economical board-to-line connection solution Single-row cable connector system
More economical, space-saving but still high-performance board-to-wire connection solutions required by many mode...[Details]
Recently, at a special series of activities focusing on the future of Shanghai's smart manufacturing and win-win industries, guided by the Shanghai Municipal Economic and Information Commission, Yang ...[Details]