Home > Power Circuits >Power Electrician Circuits > Wiring b when leakage protector supplies power to single-phase load in TN system

Wiring b when leakage protector supplies power to single-phase load in TN system

Source: InternetPublisher:super_star Keywords: Wiring leakage protector power supply BSP Updated: 2020/05/01

11.<strong>Wiring</strong> when the <strong>leakage protector</strong> supplies power to single-phase load</strong> in the TN system b.gif

Wiring b when leakage protector supplies power to single-phase load in TN system

    TN system, that is, the neutral point on the power side is directly grounded.
    In the figure, the TN-C system is a three-phase four-wire system in which the working neutral line N and the protective neutral line PE are combined into a PEN line; the TN-S system neutral line N cannot be connected to the neutral of
other equipment or lines without leakage protectors. Line N is shared and is not allowed to
be connected to the protective neutral line PE, equipment metal shells, wire steel pipes and other metal parts connected to the earth. That is to say,
a system with three phase lines, a general neutral line N and a protective neutral line PE (PE is led separately from the neutral point of the transformer) through the leakage system
is also called a five-wire system.


EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号