According to the manual, when I use MSP430 as a master receiver, if I want to end the process after receiving the next data during an interrupt, I should write STP after reading BUF. In this case, wil
There are two loads: one is a motor and the other is a music IC. A three-stage switch is required to be used as the power switch for the two loads. Please use discrete components to design a switching
[font=微软雅黑][size=4]If you are an RF practitioner and are interested in high-frequency and high-speed technologies, you must not miss this technology event. [/size][/font] [font=微软雅黑][size=4] [/size][/
Activity introduction2019.12.10 - 2019.12.31, watch the 2019 TI Industrial Applications Selected Courses, write comments, and participate in the grab-the-floor event for a chance to win exquisite gift