Notice on Organizing the Application for Municipal Subsidies for New Energy Vehicle Charging Facilities in Chengdu in 2022

Publisher:JoyfulSunflowerLatest update time:2022-05-25 Source: 成都市经济和信息化局Author: Lemontree Reading articles on mobile phones Scan QR code
Read articles on your mobile phone anytime, anywhere

Chengjingxincai〔2022〕No.16

To the competent departments of industry and information technology (energy), development and reform departments, finance departments, and relevant units (enterprises) of all districts (cities) and counties:

In order to accelerate the construction of new energy vehicle charging facilities throughout the city, in accordance with the "Chengdu City Supports the Development, Promotion and Application of Hydrogen Energy and New Energy Vehicle Industry Several Policies" (Chengjingxinfa [2019] No. 6) and "Chengdu City Supports the Development and Promotion of Hydrogen Energy and New Energy Vehicle Industry Several Policies Implementation Rules (Charging and Swapping Infrastructure Part)" (Chengjingxinban [2020] No. 1) and other documents, the relevant work of organizing the application for municipal subsidies for new energy vehicle charging facilities in Chengdu in 2022 is hereby notified as follows.

1. Applicant

The applicant is the investment subject of the charging and swapping facility project and has the ownership of the charging and swapping facility project. If there are multiple investment subjects for the same project, the relevant units shall negotiate and determine one investment subject as the applicant.

II. Scope of Application

(I) Construction subsidies: Charging and swapping facility projects that are completed and put into operation between January 1, 2021 and December 31, 2021 and meet the requirements can apply for construction subsidies. The same project shall not be applied for repeatedly.

(ii) Operation subsidy: Charging and swapping facility projects that meet the requirements and have a charging capacity between January 1, 2021 and December 31, 2021 can apply for operation subsidy.

3. Application Time

The applicant shall submit the application materials to the competent department of industry and information technology (electricity) of the district (city) or county where the project is located from May 24 to June 23, 2022. Failure to submit the application materials within the prescribed time shall be deemed as automatic waiver. The relevant departments of each district (city) or county shall summarize and preliminarily review the materials and submit them to the Municipal Bureau of Economics and Information Technology in a joint written document before July 14, 2022.

IV. Application conditions

(1) The conditions required for the applicant unit (individual) and the application project and their corresponding subsidy standards shall comply with the relevant requirements of the "Implementation Rules of Several Policies of Chengdu to Support the Development and Promotion of Hydrogen Energy and New Energy Vehicle Industry (Charging and Swapping Infrastructure Part)" (Chengjingxinban [2020] No. 1) (see attachment).

(2) For those applying for construction subsidies, the installed capacity of charging and swapping facilities built and put into operation in the administrative area of ​​Chengdu in 2021 must be no less than 1,000 kW.

(III) The applicant must connect all charging and swapping facilities including the applied project to the Chengdu New Energy Vehicle and Charging Facility Monitoring and Supervision Platform (hereinafter referred to as the Municipal Vehicle and Charging Facility Platform), and enter the charging and swapping infrastructure information and push data in real time in accordance with the requirements of the Municipal Vehicle and Charging Facility Platform.

V. Application Methods and Requirements

(I) The applicant shall bundle the projects within the same district (city) or county administrative area, compile the application materials and bind them into a book (three copies of the paper version and one copy of the electronic version), and submit them to the competent department of industry and information technology (electricity) of the district (city) or county where the project is located.

1. The applicant is responsible for the authenticity of the application materials. If false information is provided to defraud municipal subsidies, the applicant (individual) will be disqualified from applying.

2. The applicant must prepare the application materials in accordance with the requirements of the "Implementation Rules of Several Policies of Chengdu to Support the Development and Promotion of Hydrogen Energy and New Energy Vehicle Industry (Charging and Swapping Infrastructure Part)" (Chengjingxinban [2020] No. 1).

Unified data compilation format:

(1) The application materials should be bound into a booklet with a hard cover and A4 paper;

(2) The cover of the materials shall be unified as "Chengdu 2022 New Energy Vehicle Charging Facility Municipal Subsidy Application Form", with the official name of the applicant, application area, application time, contact person and contact information, and the official seal of the applicant affixed;

(3) Prepare a list of application materials in the order in which the materials are to be submitted as required by the Implementation Rules;

(4) The content of the materials (photocopy) must be clear and the electronic version (pdf format) must be complete.

(II) If the materials required for the application project are missing due to objective reasons, the applicant must submit other supporting materials (explanations) together with the application materials.

(III) The city's vehicle charging pile platform should provide guidance on the access to charging and swapping facilities, and open up green channels for data access and the issuance of certificates; the city's new energy vehicle industry alliance should play the role of industry guidance and service, organize enterprises to carry out policy disclosure, and guide and supervise enterprises to carry out declaration work in accordance with the law.

(IV) The competent departments of industry and information technology (electricity) of each district (city) should actively organize the application, classification inspection, on-site verification and other related work of municipal subsidy funds for local charging and swapping facilities, and conduct joint review with local development and reform, finance and other departments, summarize the application materials and review results and submit them to the Municipal Bureau of Economic and Information Technology in a unified document.

VI. Policy consultation telephone number

Municipal Bureau of Economics and Information Technology, Electric Power Department, Luo Jun: 61885848

Municipal Development and Reform Commission Environmental and Resources Division Chen Hu: 61884049

Municipal Finance Bureau Industry Division Jing Linzhi: 61882554

City car pile platform Zhang Sijie: 67565008

Please be notified.

Chengdu Municipal Bureau of Economics and Information Technology
Chengdu Municipal Development and Reform Commission
Chengdu Municipal Finance Bureau
May 24, 2022

Reference address:Notice on Organizing the Application for Municipal Subsidies for New Energy Vehicle Charging Facilities in Chengdu in 2022

Previous article:Trina Energy Storage and Power Electronics reach strategic energy storage cooperation
Next article:Shanxi Province promotes pumped storage and new energy storage to recycle retired power batteries

Latest New Energy Articles
Change More Related Popular Components

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号