Precautions during installation and maintenance of photovoltaic inverters

Publisher:星尘散落Latest update time:2018-04-23 Source: 来源:科讯线缆Author: Lemontree Reading articles on mobile phones Scan QR code
Read articles on your mobile phone anytime, anywhere
1. Photovoltaic inverter installation process
1. Preparation before installation
Are the product accessories, installation tools and parts complete? Is the installation environment in compliance with the requirements?
2. Mechanical equipment installation
Installation layout, inverter mobile transportation
3. Electrical wiring
DC side wiring, AC side wiring, grounding connection, communication line connection
4. Installation completion test
Inspection of photovoltaic array, AC side line, DC line, grounding, communication and accessories
5. Online operation test
If there are no problems in the test, the formal operation can be carried out. If problems are found, the operation can be carried out only after the problems are solved.
6. Official operation
2. Precautions for inverter installation
1. Site selection
When selecting an installation site, you should consider whether the surrounding environment will have any impact on the photovoltaic inverter. You should avoid direct sunlight on the inverter, otherwise it will cause the internal temperature of the equipment to be too high, causing the inverter temperature failure, thus affecting the inverter's power generation. At the same time, ensure that there is no interference from other power electronic equipment around.
2. Pre-site inspection
At the construction site, the inverter should be inspected to prevent damage during transportation.
3. Installation requirements
The installation of the inverter should keep a certain gap around it to facilitate the heat dissipation of the inverter and the maintenance of the inverter manufacturer in the future. If the inverter without lightning protection function is selected, the lightning protection system should be configured on the DC input and keep it well grounded. During the initial installation, the grid connection point should be reasonably selected. It is strictly forbidden to install a large-capacity photovoltaic power generation system at the end of the village. When installing more than 3 (including 3) inverters, different phase live wires should be connected to the grid to prevent inverter overvoltage problems.
4. Preparation for electrical connection
Before making electrical connections, be sure to cover the photovoltaic panels with opaque materials or disconnect the DC circuit breaker. Otherwise, the photovoltaic array will generate dangerous voltages if exposed to sunlight for a long time.
5. Electrical materials and wiring requirements
The cables used in photovoltaic power stations must be of qualified quality and have firm connections. DC photovoltaic cables must be crimped with special crimping pliers to avoid accidents caused by poor contact later. Electrical installation must meet local and national electrical standards, and installation operations must be completed by professional technicians.
6. Power department license
The inverter can be connected to the grid for power generation only after obtaining permission from the local power department.
3. Inverter maintenance precautions
1. In the photovoltaic power station system, no matter what maintenance work is carried out, the electrical connection between the inverter and the grid should be disconnected first, and then the DC side electrical connection should be disconnected. Secondly, wait at least 5 minutes until the internal components of the inverter are fully discharged before carrying out maintenance work.
2. During maintenance operations, perform a preliminary visual inspection of the equipment to see if there is any damage or other dangerous conditions. During specific operations, you should comply with electrostatic protection regulations, wear an anti-static wrist strap, pay attention to the warning signs on the product, pay attention to whether the hot surface temperature of the inverter has cooled down, and avoid unnecessary contact between your body and the circuit board.
3. After the maintenance is completed, make sure that any faults that affect the safety performance of the inverter have been resolved before turning on the inverter again.
Reference address:Precautions during installation and maintenance of photovoltaic inverters

Previous article:Inverter builds its own local power grid to save photovoltaic workers from the "630" tragedy!
Next article:Dongguan Development and Reform Commission's notice on standardizing the reporting of information on the construction and operation of electric vehicle charging infrastructure

Latest New Energy Articles
Change More Related Popular Components

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号