Development and Reform Commissions of all districts, Development and Reform Bureau of Beijing Economic and Technological Development Zone:
According to the relevant requirements of the "Notice of the National Energy Administration on Organizing and Implementing the "Internet +" Smart Energy (Energy Internet) Demonstration Project" (National Energy Technology [2016] No. 200), our commission plans to organize various districts to apply for the first batch of national "Internet +" smart energy (energy Internet) demonstration projects. The relevant matters are hereby notified as follows:
1. The projects submitted should comply with the relevant policies and plans of the country and our city, meet the specific requirements of this application, and be able to effectively promote structural reforms in the energy field, promote the deep integration of energy and information, and drive the development of new technologies, new models and new formats of energy Internet.
2. The Development and Reform Commissions of each district and the Development and Reform Bureau of Beijing Economic and Technological Development Zone shall organize the application of projects within their jurisdictions in accordance with the relevant requirements of the "Notice of the National Energy Administration on the Organization and Implementation of the "Internet +" Smart Energy (Energy Internet) Demonstration Project" (National Energy Science and Technology [2016] No. 200), screen and review the application projects, and submit the application materials that meet the conditions to our commission. The application projects should have carried out in-depth preliminary research work, have the basic conditions for implementation, and start construction before the end of 2017. In principle, each district shall apply for no more than one project, and priority will be given to projects that have been included in the relevant national and municipal plans. Please submit the application materials to our commission (Energy Department) before August 20, 2016.
The specific application materials are as follows:
1. The recommendation document submitted to our commission by the District Development and Reform Commission or the Development and Reform Bureau of Beijing Economic and Technological Development Zone;
2. Demonstration Project Application Form (fill in according to Appendix 1 of Notice No. 200 of National Energy Science and Technology (2016));
3. Project application report and related attachments (prepared in accordance with Attachment 2 of the Notice of National Energy Technology [2016] No. 200, and attached with relevant approval documents).
The above project application materials should be submitted in sextuplicate. The demonstration project application form and project application report should be accompanied by two electronic CDs.
3. The Commission will entrust an intermediary agency to organize expert reviews and recommend outstanding projects to the National Energy Administration based on the review results.
4. Project application materials will not be returned to the project unit.
Please be notified.
Attachment: National Energy Administration "Notice on Organizing and Implementing the "Internet +" Smart Energy (Energy Internet) Demonstration Project" (National Energy Science and Technology [2016] No. 200)
Beijing Municipal Development and Reform Commission
August 15, 2016
(Contact person: Jin Bo, Energy Department; Contact number: 66415588-0835)
Previous article:China New Energy Network was invited to participate in the Shanghai Lithium Battery Industry, Supercapacitor and Charging Pile Exhibition
Next article:"Internet +" smart energy will usher in a pilot opportunity period
- Popular Resources
- Popular amplifiers
- Increase the proportion of capacity leasing! Ningxia issued a notice on promoting the healthy development of energy storage
- A brief discussion on the application of energy storage power stations in cement plants
- Indian Army uses hydrogen microgrid to supply electricity in Himalayas
- CATL's Xiaoyao super hybrid battery fully opens the era of hybrid "large capacity"
- Gansu's new energy storage installed capacity exceeds 4 million kilowatts
- Hebei Weixian 100MW/400MWh energy storage power station project with a total investment of 650 million yuan started
- The world's first pioneering technology! Chengdu East New District's first 10 billion-level leading project is fully operational
- Shandong publishes registration information of two virtual power plants, capable of regulating 14.625 MW of electricity
- Musk: Tesla's energy storage business 'growing like wildfire'
- Innolux's intelligent steer-by-wire solution makes cars smarter and safer
- 8051 MCU - Parity Check
- How to efficiently balance the sensitivity of tactile sensing interfaces
- What should I do if the servo motor shakes? What causes the servo motor to shake quickly?
- 【Brushless Motor】Analysis of three-phase BLDC motor and sharing of two popular development boards
- Midea Industrial Technology's subsidiaries Clou Electronics and Hekang New Energy jointly appeared at the Munich Battery Energy Storage Exhibition and Solar Energy Exhibition
- Guoxin Sichen | Application of ferroelectric memory PB85RS2MC in power battery management, with a capacity of 2M
- Analysis of common faults of frequency converter
- In a head-on competition with Qualcomm, what kind of cockpit products has Intel come up with?
- Dalian Rongke's all-vanadium liquid flow battery energy storage equipment industrialization project has entered the sprint stage before production
- Allegro MicroSystems Introduces Advanced Magnetic and Inductive Position Sensing Solutions at Electronica 2024
- Car key in the left hand, liveness detection radar in the right hand, UWB is imperative for cars!
- After a decade of rapid development, domestic CIS has entered the market
- Aegis Dagger Battery + Thor EM-i Super Hybrid, Geely New Energy has thrown out two "king bombs"
- A brief discussion on functional safety - fault, error, and failure
- In the smart car 2.0 cycle, these core industry chains are facing major opportunities!
- The United States and Japan are developing new batteries. CATL faces challenges? How should China's new energy battery industry respond?
- Murata launches high-precision 6-axis inertial sensor for automobiles
- Ford patents pre-charge alarm to help save costs and respond to emergencies
- New real-time microcontroller system from Texas Instruments enables smarter processing in automotive and industrial applications
- IWR1642Boost people counting DEMO program operation process
- I would like to ask the experts to introduce the generation of 2HZ in detail. Now the buzzer circuit 2HZ does not work! ! ! ! ! !
- Why doesn't the CPU top cover use silver, which has better heat dissipation?
- Summary of low power consumption STM32L151+RTC wake-up application
- LLC design information collection (for learning only)
- Do the read and write registers of the ds2438 coulomb meter have a lifespan?
- Raspberry Pi based smartphone
- Share WB-Serial Port Debugging Assistant
- About bus conflicts (Part 2)
- PMOS is turned on