doc

Analysis of a rare explosion accident of external connecting pipe of boiler in garbage power station

  • 2013-09-22
  • 46.5KB
  • Points it Requires : 2

This paper conducts a comprehensive and detailed analysis of the causes of a very rare accident involving the bursting of an external connecting pipe in a garbage power plant boiler. Based on this, improvement suggestions are proposed to ensure the safe operation of garbage power plant boilers from three aspects: safe and environmentally friendly design of the garbage power plant, controlling the stable combustion of the garbage incinerator from the perspective of reasonable operation, and inspection of the garbage power plant boiler.

unfold

You Might Like

Uploader
mamselc
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×