The Baishan Cascade Hydropower Station consists of the Baishan Conventional Power Station, the Pumped Storage Power Station and the Hongshi Power Station, with a total installed capacity of 2 GW, and undertakes the peak load regulation, frequency regulation and emergency standby tasks of the Northeast Power Grid. In 1996, the \"unmanned operation\" (less-staffed operation) project was implemented, and the basic components of the electromechanical equipment of the Baishan Station and the Hongshi Station were gradually technically transformed. The computer monitoring system was upgraded and improved, with maintenance-free, self-diagnosis and self-recovery functions, and the remote operation and automatic control capabilities were improved, making the main equipment safe, reliable and stable, and meeting the requirements of Class I rate and intact rate [1]. Through the Huadian Cascade Dispatching Center, the remote adjustment, remote control, remote measurement and remote communication of the on-site equipment are realized, which basically meets the needs of remote centralized monitoring and operation, improves the working conditions of the power plant production personnel, and improves the power generation efficiency and production management level of the units.
You Might Like
Recommended ContentMore
Open source project More
Popular Components
Searched by Users
Just Take a LookMore
Trending Downloads
Trending ArticlesMore