pdf

Discussion on the implementation of centralized monitoring in Baishan cascade hydropower plants

  • 2013-09-22
  • 260.57KB
  • Points it Requires : 2

The Baishan Cascade Hydropower Station consists of the Baishan Conventional Power Station, the Pumped Storage Power Station and the Hongshi Power Station, with a total installed capacity of 2 GW, and undertakes the peak load regulation, frequency regulation and emergency standby tasks of the Northeast Power Grid. In 1996, the \"unmanned operation\" (less-staffed operation) project was implemented, and the basic components of the electromechanical equipment of the Baishan Station and the Hongshi Station were gradually technically transformed. The computer monitoring system was upgraded and improved, with maintenance-free, self-diagnosis and self-recovery functions, and the remote operation and automatic control capabilities were improved, making the main equipment safe, reliable and stable, and meeting the requirements of Class I rate and intact rate [1]. Through the Huadian Cascade Dispatching Center, the remote adjustment, remote control, remote measurement and remote communication of the on-site equipment are realized, which basically meets the needs of remote centralized monitoring and operation, improves the working conditions of the power plant production personnel, and improves the power generation efficiency and production management level of the units.

unfold

You Might Like

Uploader
lamaba
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×