doc

Construction organization design of water diversion tunnel project of hydropower station

  • 2013-09-19
  • 183.5KB
  • Points it Requires : 2

1 Preparation basis 1.1 The bidding documents and supplementary documents (No. 01) for the water diversion tunnel project of the Sichuan Nanyahe Yele Hydropower Station provided by the bidding unit; 1.2 Data obtained from the on-site inspection organized by the bidding unit; 1.3 Relevant national industry standards and current standards and specifications of the Ministry of Water Resources; 1.4 Relevant experience of our unit in constructing similar projects;

unfold

You Might Like

Uploader
jasionla
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×