doc

Establishing mathematical model to achieve optimal control of drug administration

  • 2013-09-20
  • 32KB
  • Points it Requires : 2

Chengdu Water Supply Plant No. 6 is a gravity flow water plant. Its water intake and water delivery adopt gravity flow. The design capacity is 600,000 m3/day, accounting for more than 60% of the city\'s water supply. Chengdu Water Supply Company has used its own technical strength and achieved automatic control of the entire process from water intake to water comparison and intelligentization of some links after several years of efforts. Except for the central control room, all workshops are unmanned, and its production safety, water quality improvement, and consumption reduction have been well guaranteed and greatly promoted.

unfold

You Might Like

Uploader
froglucky
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×