Home > Control Circuits >Motor Control > Full-step table merging route

Full-step table merging route

Source: InternetPublisher:奥特man123 Keywords: Line BSP generator switch Updated: 2021/09/26

6. Full step table method for merging <strong>route</strong>.gif


The step meter is also called the synchronization meter. It is a meter specially used for parallel vehicles . When the frequency of the generator to be paralleled is higher than the frequency of the generator
(or system grid) that has been put into operation , the pointer of the meter rotates to the faster side; otherwise, it rotates to the slower side. When the full-step meter pointer slowly approaches the vertical red line on the meter, immediately close the parallel switch . The merging route     using the whole-step table method is shown in Figure 7-6. In the figure, S is the whole step table.







EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号