• You can log in to your eeworld account to continue watching:
  • Lagrange Dual SVM
  • Login
  • Duration:18 minutes and 50 seconds
  • Date:2018/04/06
  • Uploader:老白菜
Introduction
Linear support vector machine, dual support vector machine, kernel support vector machine, soft support vector machine, kernel logistic regression, support vector regression
Unfold ↓

You Might Like

Recommended Posts

What is the maximum value written in the delay function of the 51 single-chip microcomputer?
/**1ms delay function**/ void delay(uint z) { uint x,y; for(x=z;x>0;x--) for(y=110;y>0;y--); }
dinghao1 51mcu
【Repost】Detailed introduction of commonly used voltage regulators
[align=left][font=微软雅黑]In our daily life, we often use transformers. We can see transformers in TV sets, radio recorders, air conditioners and other electrical appliances. So what are the common trans
皇华Ameya360 Power technology
[Photos] About the application of hard disk technology in slow motion production
[Photos and text] On the application of hard disk technology in slow motion production July 26, 2006 9:43 Source: World Radio and TelevisionAuthor: Mr. Sheng Xiaohui, video engineer of the Technical O
fighting Analog electronics
Report the success of the power supply!!
[i=s]This post was last edited by paulhyde on 2014-9-15 03:58[/i] I am reporting that I have successfully made a power supply!! Let’s see how many of these questions I have solved this year!!
1Eagle Electronics Design Contest
Mobile phone development, how to open the built-in GPS device in the mobile phone. Let it work and send data to the COM port. GetCommState error, return 21 device not ready.
//Open the serial port m_hComm = CreateFile(....... This step can be passed. Get the current attribute parameters of the serial port, modify and then reset the serial port. GetCommState(m_hComm,&commP
mingjin27 Embedded System
FAQ_How to calculate the response time from shutdown state to READY state
Author: Helon CHEN, ST engineer Click to download the pdf document:Q: How to calculate the response time from shutdown state to ready state A: To calculate the transition time from SHUTDOWN to READY,
nmg ST - Low Power RF

Recommended Content

可能感兴趣器件

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京B2-20211791 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号