Qicheng Automation Training was founded in 2012 by Gongkong Laogui. The training projects focus on Mitsubishi, Siemens PLC programming system integration, industrial robot programming, EPLAN electrical design, vision and other training and technical services. Recommend high-paying jobs, the harder you work, the luckier you will be.


1. Understanding and operation of the operation panel

1. Basic operation panel BOP-2

203ea326-85e9-11ee-939d-92fbcf53809c.png

Figure 1-1 Basic operation panel

The BOP-2 basic operation panel is installed above the control unit and can be used to debug the inverter, monitor operation, and input certain parameter settings. The BOP-2 operation panel has two lines of display, one line for parameter values ​​and one line for parameter names. The inverter parameters can be copied and uploaded to the operation panel, and can be downloaded to the same type of inverter when necessary.

2. Quick debugging mode

Quick commissioning is an operation mode that allows the motor to run quickly and simply by setting basic parameters such as motor parameters, inverter command source, speed setting source, etc. The steps for quick commissioning using BOP-2 are as follows:

204e1536-85e9-11ee-939d-92fbcf53809c.png

20592a66-85e9-11ee-939d-92fbcf53809c.png

2072ff9a-85e9-11ee-939d-92fbcf53809c.png

208153d8-85e9-11ee-939d-92fbcf53809c.png

20892bee-85e9-11ee-939d-92fbcf53809c.png

If P1900 is set not equal to 0 during quick commissioning, the inverter will display alarm A07991 after quick commissioning, prompting you to activate motor data identification and wait for the start command (for detailed information, please refer to Chapter 5.2 "Static Identification" in the inverter manual).

2. Parameter setting method

BOP-2 parameter modification: parameter values ​​are modified in the menus "PARAMS" and "SETUP".

1. Select parameter number:

20919432-85e9-11ee-939d-92fbcf53809c.png

2. Modify parameter values:

209feffa-85e9-11ee-939d-92fbcf53809c.png

The following steps take the modification of P700[0] parameter as an example:

20b3433e-85e9-11ee-939d-92fbcf53809c.jpg

20c35b16-85e9-11ee-939d-92fbcf53809c.png

3. BOP-2 Manual Mode

20e0c1ce-85e9-11ee-939d-92fbcf53809c.jpg

20e54e92-85e9-11ee-939d-92fbcf53809c.jpg

20f84de4-85e9-11ee-939d-92fbcf53809c.jpg

4. Restore factory settings

2102c210-85e9-11ee-939d-92fbcf53809c.jpg

2112bd3c-85e9-11ee-939d-92fbcf53809c.jpg

5. Upload parameters Inverter à BOP-2

212360c4-85e9-11ee-939d-92fbcf53809c.png

21324530-85e9-11ee-939d-92fbcf53809c.png

6. Download parameters BOP-2à inverter

21365ad0-85e9-11ee-939d-92fbcf53809c.png

214bb268-85e9-11ee-939d-92fbcf53809c.png

7. Main parameter settings

Table 1-1 Main parameter settings of the inverter

2153bc88-85e9-11ee-939d-92fbcf53809c.png


Keywords:G120 Reference address:Practical skills in setting parameters of G120 inverter

Previous article:What are the external factors that cause S7-1500 PLC failures?
Next article:There are three types of servo motor controllers introduced

Latest Embedded Articles
Change More Related Popular Components

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号