PLC programming is different from other computer software programming. The written program will not run automatically on the computer. It needs to be combined with external circuits and mechanical equipment to realize the value of the program. This is also the characteristic of automation technology. Theory + practice, the combination of software and hardware, is the correct direction of automation development. This article summarizes several basic ways to connect PLC with computer.


1. Serial port

Serial port is the earliest and most convenient way. It uses the computer's own serial port and the PLC's serial port to establish a connection. Early PLCs all adopted this download method. For example, Mitsubishi FX series, Siemens S7-200 and S7-300 series. Even in the new century, many computers have cancelled serial ports, but there are few PLCs without serial ports.


The serial port of PLC is usually used to establish a connection with the touch screen. However, computers nowadays do not have serial ports, and are generally implemented using USB to serial port cables, especially USB to 485 serial ports, which are not only used for PLCs, but also widely used for the connection of various inverters and servo drives. Don't think that inverters and servo drives only have a few parameters to set, and there is no need to connect them to the machine. When dealing with load problems, it is very necessary to monitor the parameters and various states of the inverter online.


USB to RS485 is a common tool for industrial control personnel. For example, when doing serial communication, we can use the serial assistant to monitor data. The early Siemens PLC download cable can be replaced with this cable, and it can also be used for many inverters, servo drives and all download cables that use RS485 communication. Generally, original cables are very expensive. Using a universal USB to RS485 cable can save a lot of money.


The connecting cables of Siemens S7-200, GE PLC series, Danfoss, CT, Fuji, Schneider, Lenze and other drives can be replaced by USB to 485 cables, while their original cables are extremely expensive.


2. USB

Although serial ports have many advantages, they also have many disadvantages, the biggest disadvantage being slow speed. With the advancement of technology, USB has gradually taken over half of the market, and now PLCs all support USB. The most commonly used program is the MICRO USB interface, which is the T-shaped port of old mobile phones and mobile hard disks. Not only PLCs, but also most touch screens and text displays use this interface to download programs.

9fce1ff4-d43c-11ed-bfe3-dac502259ad0.jpg

As shown in the figure above, it is a Mitsubishi FX3 series PLC. Look at the interface in the red circle. Many industrial control products have this interface. Almost all touch screens have this download interface.


There is another interface, which is the square USB interface, which is the interface on the printer. Omron PLC uses this interface, so the printer's connection cable is the download cable of Omron PLC.


As shown in the figure above, the red circle part is the download interface of Omron PLC, which is the same as the interface of the printer.

Serial port and USB are the two most commonly used connection methods, which are not only suitable for PLC, but also widely used in touch screen, servo, inverter, etc. Many PLCs support both connection methods at the same time.


As shown in the figure above, this is the connection option of Mitsubishi PLC programming software GX WORKS2. We can see that it supports two methods.


3. Network cable

With the development of Internet technology, Ethernet is increasingly used in the industrial automation industry, so many PLCs also support network connection, such as Siemens' latest TIA platform, S7-1200 series. Even the low-end S7-200smart series supports network connection.


Summary: In the field of industrial control, some people are very wise: by learning one product, they can draw inferences about other products, and by learning one problem, they can think of solutions to other problems. It is important to know how many brands of products and how many instructions to remember, but the most important thing is to use them flexibly. On the premise of understanding the principles and basic knowledge, understanding the essence of various connection methods will save you a lot of unnecessary trouble and achieve twice the result with half the effort.


Keywords:PLC Reference address:There are many basic ways to connect PLC to computer? How many do you know?

Previous article:40 Frequently Asked Questions about Inverters
Next article:A brief discussion on the self-locking and interlocking functions of PLC ladder diagram programs

Recommended ReadingLatest update time:2024-11-16 09:37

What is the carry counting system? Introduction to commonly used PLC number systems and conversion methods
1. What is the positional counting system? A number system is also called a counting system. It refers to a method of expressing values ​​using a set of fixed symbols and unified rules. The counting method is called the positional counting system. For example, in the decimal counting system, counting is ca
[Embedded]
What is the carry counting system? Introduction to commonly used PLC number systems and conversion methods
Siemens PLC S7-1500 Redundancy Configuration Practice
【A01】Preface After Siemens launched 1500, it supported redundant configuration, mainly two CPUs, 1513R and 1515R. 【A02】 Configuration steps 1. Select CPU 1515R-2 PN, 6ES7 515-2RM00-0AB0 After the selection is completed, 2 CPUs will appear. Click PROFINET interfa
[Embedded]
Siemens PLC S7-1500 Redundancy Configuration Practice
Sharing of tips on how to use PLC to judge faults and causes
Fault self-diagnosis is an important aspect of system maintainability design and an important issue that must be considered to improve system reliability. Self-diagnosis mainly uses software methods to determine the fault part and cause. The content of self-diagnosis of different control systems is differ
[Embedded]
Sharing of tips on how to use PLC to judge faults and causes
Mitsubishi PLC floating point operation instructions
Floating point operation instructions (FNC110-FNC1320) are used for floating point number processing. Floating point numbers are 32-bit numbers, including 13 instructions such as floating point comparison, transformation, four arithmetic operations, square root operations and trigonometric functions. All floating po
[Embedded]
Mitsubishi PLC floating point operation instructions
Introduction to PLC reset priority
Reset priority is to connect M0.0 through input contact I0.6 in the PLC instruction table. After M0.0 is turned on, the normally open contact of M0.0 is closed, driving Q0.0 to turn on. When the input contact I0.7 is closed, M0.0 is reset, the M0.0 coil is de-energized and disconnected, and the Q0.0 coil is de-energ
[Embedded]
Introduction to PLC reset priority
PLC programming examples and detailed explanation of empirical design method
1. Voltage reduction starting control of three-phase asynchronous motor 1. Y-△ step-down starting control of three-phase asynchronous motor The relay contactor control of the Y-△ step-down starting of the three-phase asynchronous motor is transformed into a PLC control system. (1) Determine the I/O si
[Embedded]
PLC programming examples and detailed explanation of empirical design method
How to realize EtherNet/IP communication between Siemens PLC and FANUC robot
/IP function module address: Main station Module: https://support.industry.siemens.com/cs/document/109782314/ethernet-ip-sner-–-connecng-third-party-i-o's-using-ethernet-ip?dti=0&lc=en-WW Slave Module: https://support.industry.siemens.com/cs/document/109782315/
[robot]
PLC I/O response time
Response time refers to the time required for the PLC to output a control signal after receiving an input signal. When the CPU receives an input signal corresponding to the input refresh cycle, the time used to respond depends on the scan cycle. (1) Minimum I/O response time of a single PLC The faste
[Embedded]
PLC I/O response time
Latest Embedded Articles
Change More Related Popular Components

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号