Recently, the groundbreaking ceremony for the 115,000 kW/460,000 kW-hour independent new energy storage construction projects in Bole City, Xinjiang, and 35,000 kW/140,000 kW-hour independent new energy storage construction projects in Alashankou City, Xinjiang (hereinafter referred to as the Xinjiang Bole City and Alashankou City independent new energy storage construction projects), undertaken by China Construction Eighth Engineering Bureau, was held.
Qiu Jingbo, member of the Party Leadership Group and deputy mayor of Bole Municipal People's Government of Xinjiang, Wang Lujian, deputy director of the Commerce Bureau of Bortala Mongol Autonomous Prefecture, Luo Yunhua, deputy director of the Prefecture Development and Reform Commission, Zhang Tao, chairman of Zhejiang Carson Industrial Group Co., Ltd., Li Liangliang, general manager of Bole Green Energy Zhonghe New Energy Co., Ltd., Zhang Dawei, secretary of the Party Branch of the Fifth Institute of Tianjin Municipal Engineering Design Institute, and Zhao Haifeng, secretary of the Party Branch and general manager of the Infrastructure Branch of China Construction Eighth Engineering Bureau North China Company, attended the ceremony.
Qiu Jingbo said that in recent years, Bole City has actively responded to the national policy call for the development of new energy, and based on the principle of coordinated development of traditional energy and new energy, it has developed a circular economy and built a conservation-oriented society. The project is the first energy storage project in Bole City. After completion, it will provide peak load regulation, frequency regulation, demand response support and other services for the operation of the power grid, improve the safety and stability of the Bole City power grid and the quality of power supply, and is of great significance to improving the energy consumption capacity of the power grid and achieving the "dual carbon" goal. The Bole Municipal Party Committee and Municipal Government will strengthen exchanges and cooperation with various units, focus on the entire life cycle of production, do a solid job in service guarantee, and take practical actions to create the best external environment for project construction and development, so as to promote the early commissioning and early results of the project.
Zhang Tao said that the independent new energy storage construction projects in Bole and Alashankou are important projects in the new energy field of the two cities. Their construction and implementation can not only effectively promote the optimization and upgrading of the regional energy structure and accelerate the construction of a clean, low-carbon, safe and efficient energy system, but also drive the development of the industrial chain and help rural revitalization and the comprehensive development of the economy and society. He hoped that China Construction Eighth Engineering Bureau would give full play to the advantages of building the entire industrial chain, carefully organize, manage and construct, complete the construction tasks with high quality, and jointly draw a new picture of high-quality development of the new energy industry, and contribute to the green and low-carbon development of Xinjiang and even the whole country.
Zhao Haifeng expressed his gratitude to leaders at all levels who have cared for and supported China Construction Eighth Engineering Bureau for a long time. He pointed out that the project is another concrete practice of China Construction Eighth Engineering Bureau serving Xinjiang's high-quality development, safeguarding energy security, and serving the "dual carbon" strategy. The project team will improve its political stance, strengthen its responsibilities, and build a leading demonstration of the Eighth Engineering Bureau in North China in Xinjiang and the field of new energy with a high sense of responsibility and mission; form a first-class team, prioritize resource allocation, and provide back-end service support to ensure that the project is delivered on time with high standards and high quality; strengthen safety and quality, deepen scientific and technological innovation, give full play to brand advantages, and strive to build the project into a safe project, a high-quality project, and a green project.
Persons in charge from Bortala Mongol Autonomous Prefecture, Zhejiang Kason Industrial Group, Green Energy Zhonghe New Energy Co., Ltd., Infrastructure Branch of North China Company of China Construction Eighth Engineering Bureau and relevant projects attended the event.
The independent new energy storage construction projects in Bole and Alashankou in Xinjiang include planning and layout, energy storage systems, primary and secondary electrical systems, thermal control, communications, water supply and drainage, fire protection, heating and ventilation, air conditioning, civil engineering, etc. After completion, it will improve the power energy structure of the two cities, ease the contradiction between regional power supply and demand, promote economic and social development, build a clean, low-carbon, safe and efficient energy system for the country, further ensure energy security, and contribute to the implementation of the "dual carbon" strategy.
Previous article:The country's first thermal power unit peak and frequency regulation modular molten salt energy storage project was successfully put into commercial operation
Next article:Trina Solar's 210 module shipments in the first half of the year led the industry, and energy storage shipments increased by nearly 300% year-on-year
- Popular Resources
- Popular amplifiers
- Increase the proportion of capacity leasing! Ningxia issued a notice on promoting the healthy development of energy storage
- A brief discussion on the application of energy storage power stations in cement plants
- Indian Army uses hydrogen microgrid to supply electricity in Himalayas
- CATL's Xiaoyao super hybrid battery fully opens the era of hybrid "large capacity"
- Gansu's new energy storage installed capacity exceeds 4 million kilowatts
- Hebei Weixian 100MW/400MWh energy storage power station project with a total investment of 650 million yuan started
- The world's first pioneering technology! Chengdu East New District's first 10 billion-level leading project is fully operational
- Shandong publishes registration information of two virtual power plants, capable of regulating 14.625 MW of electricity
- Musk: Tesla's energy storage business 'growing like wildfire'
- Innolux's intelligent steer-by-wire solution makes cars smarter and safer
- 8051 MCU - Parity Check
- How to efficiently balance the sensitivity of tactile sensing interfaces
- What should I do if the servo motor shakes? What causes the servo motor to shake quickly?
- 【Brushless Motor】Analysis of three-phase BLDC motor and sharing of two popular development boards
- Midea Industrial Technology's subsidiaries Clou Electronics and Hekang New Energy jointly appeared at the Munich Battery Energy Storage Exhibition and Solar Energy Exhibition
- Guoxin Sichen | Application of ferroelectric memory PB85RS2MC in power battery management, with a capacity of 2M
- Analysis of common faults of frequency converter
- In a head-on competition with Qualcomm, what kind of cockpit products has Intel come up with?
- Dalian Rongke's all-vanadium liquid flow battery energy storage equipment industrialization project has entered the sprint stage before production
- Allegro MicroSystems Introduces Advanced Magnetic and Inductive Position Sensing Solutions at Electronica 2024
- Car key in the left hand, liveness detection radar in the right hand, UWB is imperative for cars!
- After a decade of rapid development, domestic CIS has entered the market
- Aegis Dagger Battery + Thor EM-i Super Hybrid, Geely New Energy has thrown out two "king bombs"
- A brief discussion on functional safety - fault, error, and failure
- In the smart car 2.0 cycle, these core industry chains are facing major opportunities!
- The United States and Japan are developing new batteries. CATL faces challenges? How should China's new energy battery industry respond?
- Murata launches high-precision 6-axis inertial sensor for automobiles
- Ford patents pre-charge alarm to help save costs and respond to emergencies
- New real-time microcontroller system from Texas Instruments enables smarter processing in automotive and industrial applications
- EEWORLD University ---- Application of Weidmuller products in the semiconductor industry
- How to minimize the cost of low-power AC/DC circuits?
- The water hydrogen engine has officially rolled off the production line. The vehicle can run just by adding water???
- Linear thyristor power supply dimming and EMC issues
- Synopsys IP Resources: A look at the complete Ethernet PHY IP for high-performance computing SoCs
- [National Technology N32 MCU Development Package] --N32G4FR Series
- CC3220 Wireless MCU LaunchPad Development Kit Design
- 422 Driver Output Level
- "Operational Amplifier Parameter Analysis and LTspice Application Simulation" 2. Chapter 2 Bias Current
- I2C Timing