State Grid North China Branch includes vehicle-grid interactive charging piles into the power peak load auxiliary service market

Publisher:幸福花开Latest update time:2020-04-21 Source: 国家电网报Author: Lemontree Reading articles on mobile phones Scan QR code
Read articles on your mobile phone anytime, anywhere

On April 15, the North China Branch of State Grid Corporation of China officially included the vehicle-to-grid interaction (V2G) charging pile resources into the North China power peak load auxiliary service market and formally settled them for the first time in China. Through V2G charging piles, electric vehicles can participate in real-time grid control and peak load auxiliary services in two forms: charging and discharging.

According to statistics and calculations, there are about 400,000 electric vehicles in the Beijing-Tianjin-Tangshan power grid supply area. If orderly vehicle-grid interaction is achieved through V2G, 1.8 million kilowatts of mobile high-quality regulation resources can be provided. After participating in the real-time regulation and peak-shaving auxiliary services of the power grid, the average daily peak-shaving income of electric vehicles accounts for about 60% of their charging costs, which can significantly reduce charging costs and effectively enhance the enthusiasm of electric vehicle users to participate.

To promote the smooth implementation of this work, State Grid North China Branch, State Grid Electric Vehicle Service Co., Ltd., and NARI Group Co., Ltd. carried out multi-link technical innovation and breakthrough, implemented information modeling, data collection and control debugging, and completed a 72-hour automatic generation control (AGC) closed-loop test. The real-time clearing results are sent to the V2G charging piles in real time through the smart car networking platform, realizing the two-way power continuous regulation of new energy electric vehicles for two charging (nighttime and midday load trough) and two discharging (morning and evening load peaks) per day.

State Grid North China Branch adheres to the concept of mutual benefit and win-win, strengthens cooperation with State Grid Electric Vehicle Company, continuously expands the access capacity of various types of electric vehicle charging piles, enriches resource types and market varieties, actively cultivates a vehicle-grid interactive business model based on V2G charging piles, guides electric vehicles to carry out orderly charging and discharging, drives the development of the electric vehicle consumer market, and accelerates the construction of charging piles.

Reference address:State Grid North China Branch includes vehicle-grid interactive charging piles into the power peak load auxiliary service market

Previous article:The Shanxi section of the 1000 kV Mengxi-Jinzhong UHV project was completed
Next article:The official announcement of the content of "new infrastructure" has come: the top-level design will be issued to include blockchain, Internet of Things, smart energy, etc.

Latest New Energy Articles
Change More Related Popular Components

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号