Regular inspection
Check the terminal voltage and internal resistance of each unit battery regularly. For 12V unit batteries, if the terminal voltage difference between each unit battery is found to be more than 0.4V or the internal resistance of the battery is more than 80mΩ, each unit battery should be balanced charged to restore the internal resistance of the battery and eliminate the terminal voltage imbalance between each unit battery. The charging voltage during balanced charging can be 13.5~13.8V. Most batteries that have been well balanced charged can restore their internal resistance to less than 30mΩ.
During the operation of the UPS power supply, the above-mentioned imbalance caused by the change of the characteristics of each unit battery over time cannot be eliminated by relying on the charging circuit inside the UPS power supply. Therefore, for the battery pack with obvious imbalance in characteristics, if offline equalization charging is not adopted in time, the imbalance will become more and more serious.
Re-float
If the UPS power supply has been shut down for more than 10 days, before restarting it, you should start the UPS power supply without adding load to use the charging circuit inside the machine to float charge the battery for more than 10 to 12 hours before running it under load.
The UPS power supply is in a floating charge state for a long time without a discharge process, which is equivalent to being in a "storage standby" state. If this state lasts too long, the battery will fail and be scrapped due to "too long storage", which is mainly manifested in an increase in the internal resistance of the battery, which can reach several Ω in severe cases.
It has been found that after one month of storage at room temperature of 20°C, the battery's available capacity is about 97% of its rated value. If it is not stored for six months, its available capacity becomes 80% of its rated capacity. If the storage temperature rises, its available capacity will decrease.
Therefore, it is recommended that users unplug the AC input every 20 months to allow the UPS to operate in a state where the battery provides energy to the inverter. However, this operation should not be too long. When the load is about 30% of the rated output, it can be discharged for about 10 minutes.
Reduce deep discharge
The service life of the battery is closely related to the depth of its discharge. The lighter the load carried by the UPS power supply, the greater the ratio of the available capacity of the battery to its rated capacity when the mains power supply is interrupted. In this case, when the UPS power supply automatically shuts down due to low battery voltage, the depth of battery discharge is relatively deep.
How to reduce the occurrence of deep discharge of batteries in actual process? The method is very simple: when the UPS power supply is in the state of being interrupted by the mains power supply and the battery supplies power to the inverter, most UPS power supplies will periodically sound an alarm with an interval of about 4 seconds to inform the user that the battery is now providing energy. When the alarm sound becomes rapid, it means that the power supply is in deep discharge, and emergency treatment should be carried out immediately to shut down the UPS power supply. Unless it is absolutely necessary, generally do not let the UPS power supply work until it automatically shuts down due to low battery voltage.
Charging during peak hours
For users whose UPS power supply is in a low voltage supply of the mains for a long time or has frequent power outages, in order to prevent the battery from being damaged prematurely due to long-term insufficient charging, the battery should be charged at peak power supply times (such as late at night) to ensure that the battery has enough charging time after each discharge. Generally, after a battery is deeply discharged, it takes at least 10 to 12 hours to charge it to 90% of the rated capacity.
Pay attention to the selection of charger
Maintenance-free sealed batteries used in UPS power supplies cannot be charged with thyristor-type "fast chargers". This is because this type of charger will cause the battery to be in a bad charging state of both "instantaneous overcurrent charging" and "instantaneous overvoltage charging". This state will greatly reduce the battery's available capacity, and in severe cases, the battery will be scrapped. When using a UPS power supply with a constant voltage cutoff charging circuit, be careful not to adjust the battery voltage under-protection operating point too low, otherwise, it is easy to produce overcurrent charging in the initial charging period.
Of course, it is best to use a charger with both constant current and constant voltage to charge it.
Ensure power supply ambient temperature
The available capacity of the battery is closely related to the ambient temperature. In general, the performance parameters of the battery are calibrated at room temperature of 20°C. When the temperature is below 20°C, the available capacity of the battery will decrease, and when the temperature is above 20°C, the available capacity will increase slightly. Batteries of different manufacturers and models are affected by temperature to different degrees. According to statistics, at -20°C, the available capacity of the battery can only reach about 60% of the nominal capacity. It can be seen that the impact of temperature cannot be ignored.
Of course, to extend the service life of the battery pack, you must not only pay attention to maintenance and use, but also fully consider the load characteristics (resistance, inductance, capacitance) and size when selecting. Do not run the battery under excessive light load for a long time, so as to avoid the battery being scrapped due to too small discharge current.
Previous article:Solar inverter overvoltage can't generate electricity? A few tips to help you solve it easily
Next article:Yuan Liqiang, Associate Professor of Electrical Engineering, Tsinghua University: Power Routers for Energy Internet
- Popular Resources
- Popular amplifiers
- Increase the proportion of capacity leasing! Ningxia issued a notice on promoting the healthy development of energy storage
- A brief discussion on the application of energy storage power stations in cement plants
- Indian Army uses hydrogen microgrid to supply electricity in Himalayas
- CATL's Xiaoyao super hybrid battery fully opens the era of hybrid "large capacity"
- Gansu's new energy storage installed capacity exceeds 4 million kilowatts
- Hebei Weixian 100MW/400MWh energy storage power station project with a total investment of 650 million yuan started
- The world's first pioneering technology! Chengdu East New District's first 10 billion-level leading project is fully operational
- Shandong publishes registration information of two virtual power plants, capable of regulating 14.625 MW of electricity
- Musk: Tesla's energy storage business 'growing like wildfire'
- Innolux's intelligent steer-by-wire solution makes cars smarter and safer
- 8051 MCU - Parity Check
- How to efficiently balance the sensitivity of tactile sensing interfaces
- What should I do if the servo motor shakes? What causes the servo motor to shake quickly?
- 【Brushless Motor】Analysis of three-phase BLDC motor and sharing of two popular development boards
- Midea Industrial Technology's subsidiaries Clou Electronics and Hekang New Energy jointly appeared at the Munich Battery Energy Storage Exhibition and Solar Energy Exhibition
- Guoxin Sichen | Application of ferroelectric memory PB85RS2MC in power battery management, with a capacity of 2M
- Analysis of common faults of frequency converter
- In a head-on competition with Qualcomm, what kind of cockpit products has Intel come up with?
- Dalian Rongke's all-vanadium liquid flow battery energy storage equipment industrialization project has entered the sprint stage before production
- Allegro MicroSystems Introduces Advanced Magnetic and Inductive Position Sensing Solutions at Electronica 2024
- Car key in the left hand, liveness detection radar in the right hand, UWB is imperative for cars!
- After a decade of rapid development, domestic CIS has entered the market
- Aegis Dagger Battery + Thor EM-i Super Hybrid, Geely New Energy has thrown out two "king bombs"
- A brief discussion on functional safety - fault, error, and failure
- In the smart car 2.0 cycle, these core industry chains are facing major opportunities!
- Rambus Launches Industry's First HBM 4 Controller IP: What Are the Technical Details Behind It?
- The United States and Japan are developing new batteries. CATL faces challenges? How should China's new energy battery industry respond?
- Murata launches high-precision 6-axis inertial sensor for automobiles
- Ford patents pre-charge alarm to help save costs and respond to emergencies
- Frost has fallen~
- Summary by an expert: Answers to 23 classic questions in power supply development!
- 2G/GPS/Bluetooth or Zigbee IoT communication module
- Application of ZigBee in intelligent management of production lines
- COCOFLY Tutorial - Crazy Shell Drone Series · Quick Start · [4] Flight Control Firmware Burning
- The Zhongke Yihaiwei FPGA board is unboxed!
- Share a video series by Hou Jie C++
- GD32L233C-START Evaluation (3) On-chip hardware oversampling ADC
- If a device made of a single-chip microcomputer is completely powered off every half an hour, will it be easy to break down?
- Anxinke PB-02 module review (3) - PHY62XX GPIO usage guide