Insulation resistance meters usually use automatic calibration technology. Except for the parts that can be replaced, components should not be replaced at will, otherwise mistakes will occur due to neglecting the technical indicators.
I. General maintenance
1) Clean the outer shell of the meter regularly with a damp cloth and a neutral detergent. Do not use abrasives or solvents. Dirt on the terminals and the test lead terminals will affect the readings. Clean the dirt on each terminal with a detergent.
2) When not in use, press the POWER button to turn off the power. Remove the battery for long-term use.
3) The storage surface should be kept away from moisture, high temperature and strong magnetic fields.
2. Replace the battery
1) Press the POWER button to turn off the power supply, and remove the test leads or test wires from the terminals to completely disconnect the test wires from the circuit being tested.
2) Remove the two screws on the battery cover and remove the battery cover.
3) Remove the batteries from the battery box.
4) Replace them with 6 new AA (AM3/LR6) batteries (standard capacity is about 2450mAh).
5) Close the battery cover and install the two screws.
3. Replace the fuse
To avoid personal injury or damage to the instrument due to electric shock or arc burns, it is necessary to replace the fuse according to the following process. Only standard type or standard electrical standard fuses can be used for replacement.
1) Press the POWER button to turn off the power supply, and remove the test leads or test wires from the terminals to completely disconnect the test wires from the circuit being tested.
2) Remove the two screws on the battery cover, the two screws on the back cover of the housing, and the one screw behind the battery, and remove the battery cover and the back cover of the housing.
3) Gently pry up one end of the fuse, remove the burned fuse, and replace it with a standard type or standard electrical standard fuse. Make sure that the fuse is securely clamped at the base of the fuse clamp. Safety specification: F1A240V.
4) After closing the battery cover and the back cover of the housing, tighten the four screws. Do not use the instrument before tightening.
Previous article:How to use a multimeter and what to pay attention to when using it
Next article:Digital multimeter to measure capacitance
- Popular Resources
- Popular amplifiers
- Keysight Technologies Helps Samsung Electronics Successfully Validate FiRa® 2.0 Safe Distance Measurement Test Case
- From probes to power supplies, Tektronix is leading the way in comprehensive innovation in power electronics testing
- Seizing the Opportunities in the Chinese Application Market: NI's Challenges and Answers
- Tektronix Launches Breakthrough Power Measurement Tools to Accelerate Innovation as Global Electrification Accelerates
- Not all oscilloscopes are created equal: Why ADCs and low noise floor matter
- Enable TekHSI high-speed interface function to accelerate the remote transmission of waveform data
- How to measure the quality of soft start thyristor
- How to use a multimeter to judge whether a soft starter is good or bad
- What are the advantages and disadvantages of non-contact temperature sensors?
- Innolux's intelligent steer-by-wire solution makes cars smarter and safer
- 8051 MCU - Parity Check
- How to efficiently balance the sensitivity of tactile sensing interfaces
- What should I do if the servo motor shakes? What causes the servo motor to shake quickly?
- 【Brushless Motor】Analysis of three-phase BLDC motor and sharing of two popular development boards
- Midea Industrial Technology's subsidiaries Clou Electronics and Hekang New Energy jointly appeared at the Munich Battery Energy Storage Exhibition and Solar Energy Exhibition
- Guoxin Sichen | Application of ferroelectric memory PB85RS2MC in power battery management, with a capacity of 2M
- Analysis of common faults of frequency converter
- In a head-on competition with Qualcomm, what kind of cockpit products has Intel come up with?
- Dalian Rongke's all-vanadium liquid flow battery energy storage equipment industrialization project has entered the sprint stage before production
- Allegro MicroSystems Introduces Advanced Magnetic and Inductive Position Sensing Solutions at Electronica 2024
- Car key in the left hand, liveness detection radar in the right hand, UWB is imperative for cars!
- After a decade of rapid development, domestic CIS has entered the market
- Aegis Dagger Battery + Thor EM-i Super Hybrid, Geely New Energy has thrown out two "king bombs"
- A brief discussion on functional safety - fault, error, and failure
- In the smart car 2.0 cycle, these core industry chains are facing major opportunities!
- The United States and Japan are developing new batteries. CATL faces challenges? How should China's new energy battery industry respond?
- Murata launches high-precision 6-axis inertial sensor for automobiles
- Ford patents pre-charge alarm to help save costs and respond to emergencies
- New real-time microcontroller system from Texas Instruments enables smarter processing in automotive and industrial applications
- CC2500 Migration Instructions
- [DWIN Serial Port Screen] Nucleic Acid Sampling Registration System 2: Prepare Background Image
- The zigbee terminal sets the PAN ID by pressing a button to join the set ID network
- GD32E231 DIY Part 3: LED Smooth Dimming Principle
- Far away, yet close at hand
- The power cord is too long and the power-on voltage is too high. Should I use a TVS tube?
- What is the essence of GND in the circuit?
- EEWORLD University - i.MX Linux Development Practical Guide
- Encoder Problems
- Introduction to IC Packaging and Testing Process