The DC resistance tester is a high-precision replacement product that replaces the DC single-arm and double-arm bridge. The instrument pilot holding adopts advanced switching power supply technology. Its measurement speed is more than one hundred times faster than the bridge. The display part uses a four-and-a-half-digit LCD to display the measurement results, and a three-and-a-half-digit LCD to display the ambient temperature or test current value. It overcomes the shortcomings of other similar products that the LED display value is inconvenient to read in the sun. At the same time, it has an automatic arc extinguishing function. So how to use the DC resistance tester? The editor of Wuhan Longdian Electric will give you a detailed answer below.
1. Preparation before measurement:
First, connect the power cord and ground wire to the DC resistance meter reliably, then connect the test wire that comes with the machine to the input and output terminals on the DC resistance meter panel that correspond to their colors, clamp the test clamps at the end of the test wire to both ends of the transformer winding to be tested, and rub the contact points hard to ensure good contact. The wiring method is as shown in the figure below. Turn on the power switch, and the display will show the following interface
The DC resistance tester provides several different measuring currents. You can press the "▲" and "▼" keys to select according to your needs. Please pay attention to the maximum measuring range of each measuring current to prevent the measured DC resistance of the winding from being greater than the maximum measuring range of the selected current, so that the current cannot reach the preset value after the measurement starts, causing the DC resistance tester to be in a waiting state for a long time.
The "View" key is used to view and print the stored measurement data. (See "Viewing and Processing Data" for details). After selecting the measurement method and measurement current, press the "Measure" key to start the entire measurement process.
2. Start measuring:
After pressing the "Measure" button, the DC resistance meter starts charging the winding under test and displays the following interface:
A charging progress bar will appear in the display area in the middle of the display. The upper part of the progress bar is the current current value. Generally, when measuring a large inductive load, it takes a certain amount of time for the current to stabilize, and the current value rises from zero to the rated value.
Note: If the charging progress bar stagnates at a certain current value for a long time and does not rise, it is possible that the current winding resistance value exceeds the measurement range of the selected current, so that the current cannot reach the preset value. Please press the "Exit" key to exit the measurement, and then select a smaller current and try again.
When the current reaches the rated value, charging ends and the DC resistance meter starts sampling and calculating the data. The display prompts "Measuring, please wait". After the calculation is completed, the measured resistance value will be displayed on the display. After the data is stable, you can press the "Store" key to store or press the "Print" key to print the data.
Tips: When printing data in the measurement state, the DC resistance meter does not stop printing immediately after printing the current measurement result, but is in a waiting state so that the next data can be printed continuously in the print report. Therefore, when measuring the tap resistance of the on-load tap changer transformer, after measuring a tap, there is no need to exit the measurement, but directly switch to the next tap, and then press the "Retest" key to refresh the data. After the data is stable, you can press the "Store" key to continuously store or press the "Print" key to continuously print the data, and measure in this way until all the taps of the winding are measured.
When measuring a no-load tap changer, it is not allowed to switch the tap changer directly. You must exit the measurement state and switch the tap changer only after the discharge is completed!
3. End of measurement:
After the measurement is completed, press the "Exit" button to exit the measurement. At this time, if it is an inductive load, the DC resistance meter will automatically start to discharge the winding. The display prompts "Discharging, please wait" and a buzzer sounds. After the discharge indication disappears, you can remove the measurement wiring and test the next winding.
Previous article:The function of ground resistance tester
Next article:How to test ground resistance with a ground resistance tester
- Modern manufacturing strategies drive continuous improvement in ICT online testing
- Methods for Correlation of Contact and Non-Contact Measurements
- Keysight Technologies Helps Samsung Electronics Successfully Validate FiRa® 2.0 Safe Distance Measurement Test Case
- From probes to power supplies, Tektronix is leading the way in comprehensive innovation in power electronics testing
- Seizing the Opportunities in the Chinese Application Market: NI's Challenges and Answers
- Tektronix Launches Breakthrough Power Measurement Tools to Accelerate Innovation as Global Electrification Accelerates
- Not all oscilloscopes are created equal: Why ADCs and low noise floor matter
- Enable TekHSI high-speed interface function to accelerate the remote transmission of waveform data
- How to measure the quality of soft start thyristor
- Intel promotes AI with multi-dimensional efforts in technology, application, and ecology
- ChinaJoy Qualcomm Snapdragon Theme Pavilion takes you to experience the new changes in digital entertainment in the 5G era
- Infineon's latest generation IGBT technology platform enables precise control of speed and position
- Two test methods for LED lighting life
- Don't Let Lightning Induced Surges Scare You
- Application of brushless motor controller ML4425/4426
- Easy identification of LED power supply quality
- World's first integrated photovoltaic solar system completed in Israel
- Sliding window mean filter for avr microcontroller AD conversion
- What does call mean in the detailed explanation of ABB robot programming instructions?
- Europe's three largest chip giants re-examine their supply chains
- Breaking through the intelligent competition, Changan Automobile opens the "God's perspective"
- The world's first fully digital chassis, looking forward to the debut of the U7 PHEV and EV versions
- Design of automotive LIN communication simulator based on Renesas MCU
- When will solid-state batteries become popular?
- Adding solid-state batteries, CATL wants to continue to be the "King of Ning"
- The agency predicts that my country's public electric vehicle charging piles will reach 3.6 million this year, accounting for nearly 70% of the world
- U.S. senators urge NHTSA to issue new vehicle safety rules
- Giants step up investment, accelerating the application of solid-state batteries
- Guangzhou Auto Show: End-to-end competition accelerates, autonomous driving fully impacts luxury...
- New CT9-CT30 passive AC isolation sensor and its application
- Enabling 5G Mobile Communications with GaN Technology: Laying a Solid Foundation for Success
- Functional testing of wireless charging solutions for passive devices
- AFE77xx EVM Evaluation with TSW14J57 Guide
- 【BearPi-HM Micro】Northbound development and use of DevEco Studio
- [Synopsys IP Resources] How IP-based SoC design drives dynamic and diverse HPC demand to achieve full growth
- Video interference
- Analysis of the top ten popular microprocessor and memory new products in 20061
- CCS5.5&DSP/BIOS setup steps
- TI live broadcast at 8pm tonight: the latest DLP products and automotive application solutions are here, interpreting dynamic ground lights and AR-HUD solutions