Correctly selecting the installation point and correctly installing the split electromagnetic flowmeter are very important links. If mistakes are made during the installation process, the measurement accuracy will be affected at the least, and the service life of the flowmeter will be affected at the worst, and the flowmeter may even be damaged.
1. Installation requirements for split electromagnetic flowmeter
1. The split electromagnetic flowmeter has certain requirements on the upstream and downstream straight pipe sections of the installation point, otherwise it will affect the measurement accuracy.
2. If there is a tapered pipe upstream of the installation point of the split electromagnetic flowmeter, there should be a straight pipe section of equal diameter of not less than 15d upstream of the sensor, and a straight pipe section of equal diameter of not less than 5d downstream.
3. If there is a gradually expanding pipe upstream of the installation point of the split electromagnetic flowmeter, there should be a straight pipe section of equal diameter of not less than 18d upstream of the sensor, and a straight pipe section of equal diameter of not less than 5d downstream.
4. There is a 90° elbow or down-shaped joint upstream of the installation point of the split electromagnetic flowmeter. There should be a straight pipe section of equal diameter of not less than 20d upstream of the sensor and a straight pipe section of equal diameter of not less than 5d downstream.
5. If there are two 90° elbows on the same plane upstream of the installation point of the split electromagnetic flowmeter, there should be a straight pipe section of equal diameter of not less than 25d upstream of the sensor and a straight pipe section of equal diameter of not less than 5d downstream.
6. If there are two 90° elbows on different planes upstream of the installation point of the split electromagnetic flowmeter, there should be a straight pipe section of equal diameter of not less than 40d upstream of the sensor and a straight pipe section of equal diameter of not less than 5d downstream.
2. Special precautions for installation of split electromagnetic flowmeter
1. The sensor of the split electromagnetic flowmeter should be installed vertically, and the fluid should flow from bottom to top to ensure that the solid and liquid are in a mixed state. The reason is that solids (silt, small stone particles, etc.) in the medium are prone to precipitation. In addition, if there are fish and weeds in the pipeline, the movement of fish in the pipeline will cause the flowmeter output to swing back and forth; the swinging back and forth of weeds hanging near the electrode will also cause the flowmeter output to be unstable. Set a metal filter at the upstream inlet of the flowmeter to prevent fish and weeds from entering the measuring tube.
2. Improper operation of the pipeline setting to prevent negative pressure of the split electromagnetic flowmeter will cause negative pressure in the sensor. When the valves upstream and downstream of the flowmeter are closed at the same time, if the temperature of the fluid is higher than the air temperature, it will shrink after cooling, causing the pressure in the pipe to form a negative pressure. Negative pressure causes the lining and the metal conduit to peel off, causing electrode leakage.
Add a negative pressure prevention valve near the split electromagnetic flowmeter, open the valve to connect to the atmospheric pressure to prevent negative pressure from being generated in the sensor. When a vertical pipeline is connected to the downstream of the split electromagnetic flowmeter, if the upstream valve of the flow sensor is used to close or adjust the flow, negative pressure will be formed in the sensor measuring tube. In order to prevent negative pressure, back pressure needs to be added or a downstream valve needs to be used to adjust and close the flow.
Split electromagnetic flowmeters require appropriate maintenance space. Large-caliber flowmeters are often installed in instrument wells. For the convenience of pipeline installation, wiring, inspection and maintenance, appropriate space needs to be reserved. For the convenience of observation, wiring and maintenance, the instrument should be installed at a certain height from the ground to facilitate cleaning and installation.
I hope the above analysis is helpful to you. Because only when it is used correctly can it play its role. And we will provide you with this information in time. Ensure that you and the product are used normally. So please consider ABG instrument when purchasing the instrument.
Previous article:Fault Analysis of Split Electromagnetic Flowmeter During Debugging Period
Next article:Fault Detection Method of Split Electromagnetic Flowmeter
- Popular Resources
- Popular amplifiers
- Keysight Technologies Helps Samsung Electronics Successfully Validate FiRa® 2.0 Safe Distance Measurement Test Case
- From probes to power supplies, Tektronix is leading the way in comprehensive innovation in power electronics testing
- Seizing the Opportunities in the Chinese Application Market: NI's Challenges and Answers
- Tektronix Launches Breakthrough Power Measurement Tools to Accelerate Innovation as Global Electrification Accelerates
- Not all oscilloscopes are created equal: Why ADCs and low noise floor matter
- Enable TekHSI high-speed interface function to accelerate the remote transmission of waveform data
- How to measure the quality of soft start thyristor
- How to use a multimeter to judge whether a soft starter is good or bad
- What are the advantages and disadvantages of non-contact temperature sensors?
- Innolux's intelligent steer-by-wire solution makes cars smarter and safer
- 8051 MCU - Parity Check
- How to efficiently balance the sensitivity of tactile sensing interfaces
- What should I do if the servo motor shakes? What causes the servo motor to shake quickly?
- 【Brushless Motor】Analysis of three-phase BLDC motor and sharing of two popular development boards
- Midea Industrial Technology's subsidiaries Clou Electronics and Hekang New Energy jointly appeared at the Munich Battery Energy Storage Exhibition and Solar Energy Exhibition
- Guoxin Sichen | Application of ferroelectric memory PB85RS2MC in power battery management, with a capacity of 2M
- Analysis of common faults of frequency converter
- In a head-on competition with Qualcomm, what kind of cockpit products has Intel come up with?
- Dalian Rongke's all-vanadium liquid flow battery energy storage equipment industrialization project has entered the sprint stage before production
- Allegro MicroSystems Introduces Advanced Magnetic and Inductive Position Sensing Solutions at Electronica 2024
- Car key in the left hand, liveness detection radar in the right hand, UWB is imperative for cars!
- After a decade of rapid development, domestic CIS has entered the market
- Aegis Dagger Battery + Thor EM-i Super Hybrid, Geely New Energy has thrown out two "king bombs"
- A brief discussion on functional safety - fault, error, and failure
- In the smart car 2.0 cycle, these core industry chains are facing major opportunities!
- The United States and Japan are developing new batteries. CATL faces challenges? How should China's new energy battery industry respond?
- Murata launches high-precision 6-axis inertial sensor for automobiles
- Ford patents pre-charge alarm to help save costs and respond to emergencies
- New real-time microcontroller system from Texas Instruments enables smarter processing in automotive and industrial applications
- Engineers tell you how to do PCB design——[Worthy of collection]
- Big disaster! HP Japan accidentally deleted 77TB of important data from Kyoto University's supercomputer system
- Configuration and use of TI C2000 TMS320F28379D SCID SCIB
- How many filters does IMX283 CAN support at most?
- Prize discussion: Reply to the "live" DAC application you have encountered and receive 10-30 core points!
- CMD file allocation method
- LSM6DS3 3D Accelerometer and 3D Gyroscope PCB Package and Code
- Two power modules with the same voltage connected in parallel?
- cubemx sets TF to 4bit, but the file shows 1bit mode
- How to choose the inductor of BOOST boost power supply?