pdf

Discussion on the installation of radial air leakage gap control actuator on the upper part of rotary air preheater

  • 2013-09-19
  • 4.36MB
  • Points it Requires : 2

           This paper analyzes the installation problem of the upper radial air leakage gap control actuator of the rotary air preheater of the 300MW boiler in the coal-fired thermal power plant. The mechanical structure of the gap control actuator is introduced, and the installation process and precautions are described in detail. The principle of PLC programming control of the upper movable fan plate is also introduced. This paper has certain guiding significance and reference value for the installation stage of the electric power construction and the later operation, thermal control inspection and maintenance of the thermal power plant. The rotary air preheater is a flue gas tail heat exchange device commonly used on large boilers in thermal power plants. Compared with the tubular air preheater, the rotary air preheater has the characteristics of compact structure, small size, high heat exchange surface density, light weight, low metal consumption, easy installation and layout, and less low-temperature corrosion than the tubular heat exchanger, which is suitable for use on large boilers. However, the disadvantage of the rotary air preheater is that the air leakage is large, which is 6% to 8% when the working conditions are good and 20% to 30% when the sealing is poor, which is greater than the air leakage of the tubular heat exchanger below 5%. In addition, the rotary air preheater has a complex structure, high manufacturing process and installation requirements, a large workload for operation and maintenance, and is difficult to automatically control in hot state. A higher amount of air leakage causes a decrease in the air pressure at the preheater inlet, an increase in the fan current, an increase in the excess air coefficient after the preheater, a decrease in the exhaust gas temperature at the tail end, a decrease in the boiler thermal efficiency, an increase in coal consumption, and the boiler cannot reach the rated load. Therefore, it is particularly important to control the air leakage of the rotary air preheater in hot state, and the installation problem of the gap control actuator of the automatic tracking system in the upper radial leakage control system is particularly prominent. How to correctly install the upper radial leakage control gap actuator is of great significance to the leakage control of the entire air preheater, and it is necessary to discuss and study it. 0. Preface....2 pages 1. Must-read for air preheater construction safety 3 pages 2. Overview of air preheater gap system 3 pages 3. Schematic diagram of gap actuator structure and working principle. 6 pages 4. Numbering and positioning of gap actuator on air preheater.............8 pages 5. Definition of \"initial installation position\" of gap actuator. 9 pages 6. Installation method of gap actuator. 9 pages 7. Preliminary installation method of expansion joint 11 pages 8. Definition of total length of fan plate hanger 13 pages 9. How to change the total length of hanger and leveling method of fan plate....13 pages 10. Definition of \"initial installation\" of gap actuator. 14 pages 11. Leveling of fan plate in two senses..15 pages 12. Common mechanical problems of gap actuator during installation. 15 pages 13. How to deal with mechanical problems encountered by electric construction during actuator installation. 16 pages 14. Prerequisites for defining mechanical zero position..17 pages 15. Definition of mechanical zero position..17 pages 16. Method for setting mechanical zero position.19 Page 17. Setting and adjustment method of upper limit position 1 and upper limit position 2...19 Page 18. Adjustment method of mechanical zero position.20 Page 19. How to fix the total length of the hoist when the mechanical zero position is unchanged.21 Page 20. Calibration of mechanical zero position..21 Page 21. Later construction plan of expansion joint....21 Page 22. Inspection and test content after installation of gap actuator.23 Page 23. Inspection and confirmation method of hoist plane.23 Page 24. Sign of installation completion of gap actuator.26 Page 25. Definition of electrical zero position..26 Page 26. Installation position and method of gap probe.27 Page 27. Precautions when installing gap probe.31 Page 28. Use of gap probe three-point bracket and its influence on gap detection signal.34 Page 29. Installation and adjustment method of upper radial seal.......38 Page 30. Matters needing attention in installation and adjustment of upper radial seal.40 Page 31. Matters needing attention in positioning and adjustment of upper movable fan plate.......40 Page 32. Welding scheme for the hand hole door under the fan plate. Page 41. Page 33. Insulation construction scheme for the primary air beam. Page 42. Page 34. Installation position scheme for the gap amplifier box. Page 42. Page 35. Cable connection standards for the gap actuator and amplifier box. Page 44. Page 36. Methods and contents of dual power supply phase sequence verification for the gap system... Page 44. Page 37. Confirmation and importance of the air preheater rotor direction. Page 44. Page 38. Importance of the air preheater rotor drive current 4~20mA signal to the gap actuator. Page 45. Necessary current protection measures for the gap actuator. Page 46. Page 40. Daily maintenance of the gap actuator. Page 46. Page 41. Issues regarding the PLC processing of gap signal data in the gap control program. Page 46. Page 42. Conclusion. Page 51. Page 43. References. Page 51. Page 44. Postscript. Page 51.

unfold

You Might Like

Uploader
lamaba
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×