pdf

Real-time detection of contact network stress and early warning system for line break accidents

  • 2013-09-22
  • 206.3KB
  • Points it Requires : 2

This paper analyzes the current status of railway contact network research at home and abroad, and proposes a system that can perform real-time online detection of railway contact network tension and early warning of disconnection accidents. The basic working principle of the system and the characteristics of ARM embedded microprocessor and magnetostrictive tension sensor are introduced, and the principle of disconnection alarm using GPRS SMS communication and the process of timed self-checking are analyzed. The power consumption of the system is analyzed, and finally the equipment list and devices are listed.

unfold

You Might Like

Uploader
csdn_can
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×