pdf

Electronic billboard integrated management and control system

  • 2019-11-27
  • 779.66KB
  • Points it Requires : 2

Generally, in laboratories and metrology rooms, how to see the working status of personnel, the use status of instruments, the progress of tasks, etc. are what all institutions are eager to know. Our laboratory mainly does metrological testing of electromagnetic instruments, so we have been looking for a software system such as the electromagnetic testing task management system. I would like to share with you a document that we have been using. For testing, optical testing, chemical testing, radio testing, mechanical testing, microbial testing, environmental testing, online environmental testing, temperature testing of multiple devices, environmental testing chambers, high and low temperature testing, salt spray testing, temperature and humidity experimental task management, etc. can all be met. I hope it will be helpful to everyone~~

unfold

You Might Like

Uploader
赵君2019
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×