CC2640R2F has supported Alibaba Cloud Link IoT platform, which can help customers quickly develop products. There are routines available for customers. For detailed introduction, please refer to the f
1. Interrupt nesting, the control bit of the priority430 general interrupt is the GIE bit in the status register (this bit is in the SR register). When this bit is in the reset state, all maskable int
[i=s]This post was last edited by a media student on 2019-1-3 21:18[/i] [align=center][b][color=#9932cc]Use STM32CubeMX software to speed up the development process[/color][/b][/align][align=center][b
Power supply development is a technical and tiring job. When the work is complicated, it is inevitable to make some low-level mistakes. These mistakes will lead to a series of chain reactions, and man
[align=center][/align] [align=left][font=宋体]The book "Basics of Power Supply Design" is the result of the technical compilation of the Unitrode/Texas Instruments Technical Seminar Project in the past