I would like to ask how to automatically add test points to the whole board in AD? The current method is rather clumsy. For example, for 20 networks, I first copy 20 test point pads, then add networks
[i=s]This post was last edited by Yaojishanchuan on 2021-3-16 14:32[/i]The boot logo of the ITOP-3399 platform is divided into two stages, namely the logo of the u-boot stage and the logo of the kerne
Analog IIC is a relatively simple way to lock IIC. It is easy to program and modify. So I usually use analog IIC for IIC operation. The OLED program is based on the OLED display code of Zhengdian Atom
I2C is not working, possible reasons and analysis steps:1. Check whether the power is on correctly2. Check whether the master input clock (mclk) of the slave chip is correct3. Check whether the i2c li