l Testing runs through the entire process of network planning and optimization, and it shoulders the important task of basic data collection. Its life cycle starts from network planning and ends with network optimization. l Continuous wave testing is mainly carried out in the network planning stage, and the collected data will be used as a \"sample point\" for propagation model correction. l In the network optimization stage, comprehensive testing of network performance will be carried out, and the collected data will provide an indispensable basis for engineers to locate and solve various network problems. This film focuses on DT and CQT testing.
You Might Like
Recommended ContentMore
Open source project More
Popular Components
Searched by Users
Just Take a LookMore
Trending Downloads
Trending ArticlesMore