1.1 Check whether there are any problems with the design and installation of the boiler\'s smoke and air system and its main auxiliary equipment; 1.2 Understand the primary and secondary air characteristics of the boiler, test the critical fluidizing air volume of the fluidized bed, the characteristics of the return feeder, etc., to provide a basis and parameters for the startup and operation of the fluidized bed boiler.