Cold Test Plan for 220t/h Circulating Fluidized Bed Boiler

  • 2013-09-17
  • 30KB
  • Points it Requires : 2

1.1 Check whether there are any problems with the design and installation of the boiler\'s smoke and air system and its main auxiliary equipment; 1.2 Understand the primary and secondary air characteristics of the boiler, test the critical fluidizing air volume of the fluidized bed, the characteristics of the return feeder, etc., to provide a basis and parameters for the startup and operation of the fluidized bed boiler.

unfold

You Might Like

Uploader
nonogugu66
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×