doc

Optimization of High FER in CDMA Network

  • 2013-09-29
  • 86KB
  • Points it Requires : 2

              Optimization of high FER in CDMA network Optimization of high FER in CDMA network 1. Introduction For mobile communication operators, with the rapid growth of the number of mobile users in my country, the construction of mobile communication networks is particularly important. With China\'s entry into the WTO and the intensified competition among operators, the quality of the network has become a fundamental factor in determining their fate. Network optimization is a very important process in the construction of mobile communication networks, and its purpose is to improve the communication quality of the network. Mobile communication network is a dynamic network. The network load is changing at any time, the services on the network are constantly updated, and the network\'s demand for resources will also change dynamically. All of these will cause operators to adjust their networks at any time in order to optimize resource allocation and reasonably adjust network parameters to achieve the best operating state of the network. This is the goal of wireless network optimization. For CDMA mobile communication systems, network optimization is more important because CDMA mobile communication systems are interference-limited communication systems. The capacity of the system is soft capacity. Network optimization can not only improve the performance and service quality of the network, but also increase the capacity of the system. 2. Process of CDMA mobile communication network optimization [pic] Network optimization is divided into initial optimization of a single base station and network optimization under load conditions of multiple base stations according to the number of optimized base stations. The initial optimization of a single base station is carried out after the base station is installed. It includes (1) Debugging of base station equipment. Debugging of base station equipment includes loading of initial data of the base station, testing of transmission parameters of base station equipment and testing of basic performance parameters of equipment. (2) Environmental noise test. The purpose of environmental noise test is to understand the electromagnetic interference of the surrounding environment of the base station and eliminate the interference source. (3) Base station operation verification. After the environmental noise test and base station debugging are completed, the base station should be subject to necessary operation verification before it is officially put into operation. The verification work mainly includes the following contents: fixed→mobile call, mobile→fixed call, mobile→mobile call, correspondence between sector and PN offset index, received signal strength, signal-to-noise ratio and switching between the sector of this base station and the sector of the neighboring base station. Since the actual system always runs under load, the network optimization of the system is generally carried out under load conditions. That is, network optimization under load conditions of multiple base stations is for systems that have been put into actual operation and the number of users has already been...             

unfold

You Might Like

Uploader
jujuyaya222
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×