doc

Introduction to Thermal Control System of 300MW Units in Heze Power Plant

  • 2013-09-22
  • 41.5KB
  • Points it Requires : 2

The second phase of Heze Power Plant is an expansion project, with an expansion capacity of 2X300MW coal-fired condensing steam generator sets. The steam turbine and generator use imported technology equipment produced by Shanghai Steam Turbine and Shanghai Generator Co., Ltd., the boiler uses the \"W\" type flame furnace produced by British MBEL Company, and the DCS uses the INFI-90 system of British ABB Bailey.

unfold

You Might Like

Uploader
huhuhah0009
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×