Huangjiang Dynasty Hotel Annex Project is a dedicated service facility for the hotel, with a total construction area of 14,000m2, a long axis length of 8.4m, a short axis length of 7.2m, a total length of 51.0m in the north-south direction, and a total length of 36.6m in the east-west direction. From the third floor, the interior is hollowed out to form a large atrium garden, with a 4# elliptical arc staircase leading to the fifth floor floor. The long axis of the hollow ellipse from the fourth to the fifth floor is 29.8m, and the short axis is 18.3m. The middle part above the sixth floor (pipeline layer) is an elliptical cone-shaped concrete barrel structure that gradually shrinks inward, with a total vertical height of 7.8m, a long axis of 29.0m at the lower mouth, and a short axis of 17.5m, and a long axis of 26.4m at the upper mouth, and a short axis of 14.9m. 1.0m below the upper mouth is a 1m deep inclined ring beam, on which 16 brackets are provided for installing the grid.
You Might Like
Recommended ContentMore
Open source project More
Popular Components
Searched by Users
Just Take a LookMore
Trending Downloads
Trending ArticlesMore