pdf

Centralized meter reading system based on GPRS and ARM

  • 2014-03-05
  • 6.75MB
  • Points it Requires : 2

The centralized meter reading system is a complete system that integrates modern management, computer application, modern communication technology, automatic control, information and other multidisciplinary technologies to realize multiple functions such as power marketing monitoring, power marketing management, business meter reading, data collection and network connection. This paper designs a centralized meter reading system based on GPRS and ARM technology, making full use of the advantages of GPRS communication real-time online, flow-based billing and high-speed transmission. This system uses Huawei\'s GTM900-B module, which is suitable for occasions with small data transmission. Users can also realize data transmission functions without implementing PPP protocol. The centralized meter reading system based on GPRS and ARM consists of three main components: a system management center (master station) based on the .NET platform, a communication network based on GPRS and a terminal system based on the ARM platform. The system management center is responsible for the collection, storage and analysis of system data; the terminal system realizes the information collection and control of remote power equipment; and the communication network establishes a data transmission link between the management center and the terminal system. The centralized meter reading system based on GPRS and ARM enriches the original application functions of the previous system and improves the comprehensive performance of the centralized meter reading system. After testing, the system can dial smoothly, send and receive data with the main station normally, collect meter data and issue upper computer management commands normally, and achieve the expected effect and design requirements. The system has been applied to a certain extent in Shishou, Huanggang, Huangshi, Shiyan, Hubei and some counties and cities in Hunan. Under the complex power supply environment in Shishou area, the data of all meters in 20 substations can be collected to the main station on time and correctly, and the terminal can also respond to the commands issued by the main station normally to realize the designed functions, which proves that the system is stable and reliable, which is conducive to the safety and economic management of the distribution network operation, and plays a positive role in strengthening power management and improving the power supply quality of the power grid.

unfold

You Might Like

Uploader
csdn_can
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×