pdf

Power Engineering Design Manual 07 Design of Auxiliary Systems of Circulating Fluidized Bed Boilers

  • 2024-03-31
  • 3.11MB
  • Points it Requires : 1

 \"Power Engineering Design Manual: Design of Auxiliary Systems of Circulating Fluidized Bed Boilers\" is a sub-volume of the \"Power Engineering Design Manual\" series of manuals. It is a practical reference book for the design of circulating fluidized bed boiler units. The main contents of the book include the design principles, design points, design calculations, system determination, control requirements, equipment selection and layout of the primary air system, secondary air system, high-pressure fluidized air system, flue gas system, coal screening and crushing system, boiler coal feeding system, coal slurry conveying system, limestone powder preparation system, limestone powder conveying system, bed material system, bottom ash system, ignition fuel oil system, and boiler emergency water supply system. This book is written in accordance with the requirements of the new standard, fully absorbing the advanced concepts and mature technologies of the construction of new thermal power plants in the 21st century, widely collecting mature and advanced cases of circulating fluidized bed boiler system design, and comprehensively reflecting the new technologies, new equipment and new processes used in the construction of circulating fluidized bed power plants in recent years. \"Electric Power Engineering Design Manual: Design of Auxiliary Systems of Circulating Fluidized Bed Boilers\" is a tool book for design, construction and operation management personnel of circulating fluidized bed boiler units. It can also be used as a reference book for teachers and students of relevant majors in colleges and universities, and operation management personnel of power companies. Preface General Introduction Preface Chapter 1 Overview 1 Section 1 Principle and Characteristics of Circulating Fluidized Bed Boilers 1 1. Circulating Fluidized Bed Principle 1 2. Characteristics of Circulating Fluidized Bed Boilers 2 Section 2 Main Structural Characteristics of Circulating Fluidized Bed Boilers 3 1. 125MW Circulating Fluidized Bed Boilers 4 2. 300MW Circulating Fluidized Bed Boilers 4 3. 600MW Circulating Fluidized Bed Boilers 6 Section 3 Main Auxiliary Systems 6 Chapter 2 Primary Air System 8 Section 1 System Description 8 1. System Function 8 2. Design Scope 8 3. Main Equipment of the System 8 4. Design Content 8 Section 2 Design Scheme 9 1. Design Principles 9 2. Commonly Used Design Schemes 9 Section 3 Control Requirements 25 Section 4 Design Calculation 25 1. Primary Fan Parameter Calculation 25 2. Coal Spreading Fan Parameter Calculation 28 3. Duct Design Calculation 29 Section 5 Equipment Selection 29 1. Primary Fan 29 2. Coal Spreading Booster Fan 30 3. Primary Fan Adjustment Method 31 Chapter 3 Secondary Air System 34 Section 1 System Description 34 1. System Function 34 2. Design Scope 34 3. Main Equipment of the System 34 4. Design Content 34 Section 2 Design Scheme 35 1. Design Principles 35 2. Common Design Schemes 35 Section 3 Control Requirements 51 Section 4 Design Calculation 51 1. Fan Parameter Calculation 51 2. Air Duct Specification Calculation 54 Section 5 Equipment Selection 54 1. Fan Selection 54 2. Main Performance Indicators of Fans 55 3. Fan Adjustment Methods 55 Chapter 4 High-Pressure Fluidized Air System 56 Section 1 System Description 56 1. System Function 56 2. Design Scope 56 3. Main Equipment of the System 56 4. System Design Content 57 Section 2 Design Scheme 57 1. Design Principles 57 2. Common Design Schemes 57 Section 3 Control Requirements 67 1. Normal Operating Conditions 67 2. Shutdown Conditions (Taking a 300MW CFB Boiler Unit with 5 Fans and External Beds as an Example) 67 3. Startup Conditions 67 4. Adjusting the Damper 67 Section 4 Design Calculation 67 1. Fan parameter calculation 67 2. Duct design calculation 68 3. Calculation case 68 Section V Equipment selection 70 1. Fan selection 70 2. Fan main performance indicators 74 3. Fan adjustment method 74 Chapter V Flue gas system 75 Section I System description 75 1. System function 75 2. System scope 75 3. System main equipment 75 4. System design content 76 Section II Design scheme 76 1. Design principles 76 2. Common design schemes 77 3. Flue gas purification system 85 4. Flue gas waste heat utilization 88 5. Combination of common schemes 88 Section III Control requirements 89 1. Start-up conditions 89 2. Normal operating conditions 89 3. Shutdown conditions 90 Section IV Design calculation 90 1. Dust collector parameters 90 2. Draft fan parameters 90 3. Duct selection 91 4. Calculation case 91 Section V Equipment selection 91 1. Air preheater selection 91 2. Draft fan 93 3. Dust collector 94 Chapter 6 Coal Screening and Crushing System 96 Section 1 System Description 96 1. Design Content 96 2. Coal Particle Size Requirements 96 3. Factors Affecting the Design 97 Section 2 Design Scheme 98 1. Coarse Screening and Crushing System 98 2. Fine Screening and Crushing System 98 3. Layout Considerations 111 Section 3 Control Requirements 119 Section 4 Design Calculations 119 Section 5 Equipment Selection 119 1. Screening Equipment 119 2. Distributor 127 3. Crushing Equipment 127 Chapter 7 Boiler Coal Feeding System 133 Section 1 System Description 133 1. System Function 133 2. Design Scope 133 3. Main System Equipment 133 4. System Design Content 134 Section 2 Design Scheme 134 1. Design Principles 134 2. Common Design Schemes 135 Section 3 Control Requirements 164 1. Startup Conditions 164 2. Normal Operating Conditions 164 3. Shutdown Conditions 164 Section 4 Design Calculations 164 1. Raw Coal Bunker 164 2. Coal feeding system output 165 Section 5 Equipment selection 166 1. Pressure-resistant weighing belt coal feeder 166 2. Buried scraper coal feeder 166 3. Center feeder 168 Chapter 8 Coal slime conveying system 170 Section 1 Coal slime characteristics 170 1. Physical and chemical properties 170 2. Rheological properties 171 3. Pipeline transportation characteristics 171 Section 2 Design scheme 171 1. Design principles 172 2. Automobile entry scheme 172 3. Belt conveyor entry scheme 172 4. Pipeline transportation entry scheme 173 Section 3 Coal slime shed system 173 1. System description 173 2. Design scheme 173 3. Equipment selection 178 Section 4 Coal slime pipeline conveying system 180 1. System description 180 2. Design scheme 180 3. Control requirements 187 4. Design calculation 188 5. Equipment selection 188 Section 5 Coal slime feeding system 197 1. System description 197 2. Design scheme 197 3. Equipment selection 201 Chapter 9 Limestone powder preparation system 207 Section 1 Limestone powder characteristics 207 1. Physical properties 207 2. Chemical characteristics 207 3. Particle size requirements 207 Section 2 Design scheme 209 1. Design principles 209 2. Common design schemes 209 Section 3 Limestone loading, unloading, storage and transportation system 210 1. Loading, storage system 210 2. Transportation system 215 Section 4 Coarse crushing system 222 1. System description 222 2. Design principles 222 3. Equipment selection 222 Section 5 Fine crushing system 224 1. Crusher + mechanical screening system 224 2. Column mill + pneumatic sorting system 228 3. Furnace internal and external integrated system 238 4. Limestone silo and limestone powder silo 242 Chapter 10 Limestone powder transportation system 246 Section 1 System description 246 Section 2 Design scheme 246 1. Design principles 246 2. Common design schemes 246 Section 3 Low-pressure pneumatic conveying system 247 1. System description 247 2. Design scheme 247 3. Control requirements 248 4. Design calculation 249 5. Equipment selection 249 Section 4 Primary positive pressure pneumatic conveying system 249 1. System description 249 2. Design scheme 250 3. Control requirements 250 4. Design calculation 254 5. Equipment selection 254 Section 5 Secondary positive pressure pneumatic conveying system 256 1. System description 256 2. Design scheme 256 3. Control requirements 256 4. Equipment selection 259 Chapter 11 Bed material system 260 Section 1 Bed material characteristics 260 Section 2 Design scheme 260 1. Mechanical bed material addition system 260 2. Pneumatic bed material addition system 260 3. Artificial bed material addition system 261 4. Others 261 Section 3 Mechanical addition system 261 1. Coal feeder mechanical conveying scheme 261 2. Gravity mechanical conveying scheme 264 Section 4 Pneumatic Addition System 265 1. System Description 265 2. Design Scheme 265 3. Design Calculation 270 4. Control Requirements270 V. Equipment Selection 270 Chapter 12 Bottom Ash System 271 Section 1 Bottom Ash Cooling System 271 1. System Description 271 2. Design Scheme 272 3. Control Requirements 287 4. Design Calculation 291 V. Equipment Selection 291 Section 2 Bottom Ash Conveying and Storage System 296 1. System Description 296 2. Design Scheme 296 3. Control Requirements 301 4. Design Calculation 302 V. Equipment Selection 302 Chapter 13 Ignition Fuel Oil System 305 Section 1 System Description 305 1. System Function 305 2. Design Scope 305 3. Main System Equipment 305 4. Design Content 305 Section 2 Boiler Oil Burner 305 1. Form 305 2. Features 309 3. Layout 310 4. Atomization Method 314 5. Cleaning Method 314 Section 3 Design Scheme 314 1. Design Principles 314 2. Commonly Used Design Schemes 316 Section 4 Design Calculation 325 1. Oil tank design calculation 325 2. Heavy oil system low pressure recirculation design calculation 326 Chapter 14 Boiler emergency water supply system 328 Section 1 System Description 328 1. System function 328 2. Design scope 328 3. System main equipment 328 4. Design content 328 Section 2 Design scheme 329 1. Design principles 329 2. Common design schemes 330 Section 3 Control requirements 334 Section 4 Design calculation 334 1. System capacity 334 2. Emergency water supply pump selection parameters 334 3. Case calculation 335 Section 5 Equipment selection 336 1. Emergency water supply tank 336 2. Emergency water supply pump group 336 3. Emergency water supply system parameter reference table 337 Symbols of main quantities and their measurement units 338 References 339

unfold

You Might Like

Uploader
抛砖引玉
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×