Textbook 3: On the consideration of several key links in 3G network planning and design (Zhongjing Institute) Textbook 3 of 3G Technology and Planning Advanced Training Class On the consideration of several key links in 3G network planning and design March 2004 Shenzhen 13G Technology and Planning Advanced Training Class internal materials, please do not spread MA BENTENG General Engineer Beijing P&T Design Institute (CMCC) Radio Department Mobile : +86 136 0116 9329 e-mail : mabenteng@bcdi.com.cn23G Technology and Planning Advanced Training Class internal materials, please do not spread Contents33G network construction resource survey and preparation; Wireless network planning methods and important issues; Core network planning process; Indoor coverage solution; Network configuration method; Handover problem consideration; Network expansion and optimization; Our work on 3G; Our experience Our technical characteristics and advantages;3G Technology and Planning Advanced Training Class internal materials, please do not spread 3G network construction resource survey and preparation Determination of coverage target type Dense urban area (CBD, Dense Urban, Dense Block Building, etc.) Ordinary urban suburban rural highways, main roads, scenic spots/exhibition areas/tourist areas, other traffic analysis and site selection basics 43G Technology and Planning Advanced Training Class internal data, please do not spread 3G network construction resource survey and preparation Existing network resource survey and preparation Basic conditions of base stations Computer room conditions Frequency conditions Other basic conditions of base stations GSM900 has been opened station original data: Base station name, SITE ID, base station latitude and longitude, antenna direction, antenna downtilt angle, base station height, BSC, network structure Try to make use of the original 2G site, computer room and other conditions 53G Technology and Planning Advanced Training Class internal data, please do not spread 3G network construction resource survey and preparation Computer room conditions Space: Leave installation space for 1-2 3G cabinet equipment; Transmission: The transmission capacity required by WCDMA base station is large, it is recommended to use self-owned transmission as much as possible; Power supply: WCDMA equipment uses...
You Might Like
Recommended ContentMore
Open source project More
Popular Components
Searched by Users
Just Take a LookMore
Trending Downloads
Trending ArticlesMore