pdf

Guidelines for welding process of metal spiral casing installation of hydraulic turbine DL/T 5070-1997

  • 2013-09-22
  • 170.2KB
  • Points it Requires : 1

DL/T 5070-1997 Guidelines for Installation Welding of Metal Spiral Casings for Water Turbines This standard was developed in accordance with the arrangement of the 1995 Electric Power Industry Standards Plan Project (Second Batch) (Technical General Document [1995] No. 44) of the Ministry of Electric Power Industry. The format and planning of the standardization are based on GB/T1.1 \"Guidelines for Standardization Work\" and comply with DL/T600 \"Basic Provisions for the Preparation of Electric Power Standards\". This standard is part of a series of process guidelines for the installation of hydropower turbine generator sets in hydropower stations. It stipulates the process methods, operating procedures and technical requirements for the assembly, installation, welding and welding inspection of metal spiral casings of water turbines on site. The content and requirements of the guideline are proposed on the basis of summarizing the installation and construction experience of metal spiral casings for water turbines in large hydropower stations in China. In particular, it summarizes the mature processes of construction equipment of a new batch of million-kilowatt hydropower stations such as Longyangxia, Yantan, Manwan, Wuqiangxi, Geheyan, Ankang and Shuikou that have been put into operation recently, and summarizes and improves them. It has certain guiding significance and practical value for engineering construction and quality assurance. It mainly includes the following basic contents: (1) General technical requirements for volute installation and welding; (2) Assembly and welding of volute tube segments; (3) Installation (hanging) and welding of volute; (4) Inspection of volute welding; (5) Reinforcement and deformation monitoring of volute; (6) Water pressure test on volute. In order to unify the technical names and terms frequently used in construction over the years and give them real physical concepts and engineering meanings, this standard has a separate chapter to give the definitions of the relevant names and terms, and also specifies the scope of application of the standard. The formulation of this standard began in the mid-1980s. At that time, the former Water Resources and Hydropower Construction Bureau proposed a plan to compile a series of process guidelines for the installation of hydro-turbine generator sets, among which the two standards \"Technical Guidelines for Installation and Welding of Metal Volutes of Hydro-turbines\" and \"Technical Guidelines for Assembly and Welding of Split-petal Runners of Francis Turbines\" were entrusted to the Seventh Engineering Bureau of China Hydropower and Hydropower for drafting. The Seventh Engineering Bureau of China Hydropower and Hydropower submitted the draft for comments as planned and distributed it to various units for comments. The basis for the preparation of the draft for comments was based on the construction experience and practice of several large power stations that had been built at that time, such as Gongzui, Liujiaxia, and Danjiangkou. Due to changes in the organization, the impact of engineering tasks, and personnel changes of the main editors, the preparation of the above two process guidelines was interrupted. In 1995, the Standardization Technical Committee for Hydropower Station Turbine Generators of the Ministry of Electric Power Industry (affiliated to China Water Resources and Hydropower Engineering Corporation) believed that according to the requirements of the standardization system table of the Ministry of Electric Power Industry, the series of process guidelines for the installation of hydropower generator sets had been basically formulated and distributed in full, and only the above two process guidelines should be re-planned and formulated on the basis of supplementing the construction experience of Longyangxia, Baishan, Ankang, Yantan, Manwan, Lijiaxia and other power stations, so that they can be issued and put into use as soon as possible. Under the leadership of the Standardization Department of the China Electricity Council and with the strong support of the Water and Agriculture Department of the Ministry of Electric Power Industry, the re-formulation work was organized and implemented by China Water Resources and Hydropower Engineering Corporation and the Standardization Technical Committee for Hydropower Station Turbine Generators of the Ministry of Electric Power Industry. During the formulation process, the Technical Committee for Standardization of Hydropower Station Turbine Generators of the Ministry of Electric Power Industry conducted multiple technical reviews, standardized arrangements and proofreading on the draft for approval and the draft for examination, so that the formulation work could be completed as planned. Appendix A of this standard is a prompt appendix. This standard is proposed by the Standardization Department of the China Electricity Council. This standard is under the jurisdiction of the Technical Committee for Standardization of Hydropower Station Turbine Generators of the Ministry of Electric Power Industry and the Technical Committee for Standardization of Hydropower Station Turbines. The drafting units of this standard are: China Water Resources and Hydropower Seventh Engineering Bureau, China Water Resources and Hydropower Engineering Corporation. The main drafters of this standard are: Li Guozhi, Zhao Congmao, Li Yongmao, Shen Xiaojie. The Technical Committee for Standardization of Hydropower Station Turbine Generators of the Ministry of Electric Power Industry is responsible for interpreting this standard.

unfold

You Might Like

Uploader
hellopinkgirls
 

Recommended ContentMore

Popular Components

Just Take a LookMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号
×