This guideline applies to domestically produced thermal power generating units with a capacity of 200MW and above that have completed full-load trial operation and transferred to trial production in accordance with the relevant requirements of the New Regulations. Thermal power generating units below 200MW can refer to this guideline if a trial production period is arranged. All unit performance assessment test items specified in the contract shall be tested in accordance with the provisions of the contract, and the results shall be deemed to be the results of the corresponding performance test items specified in this guideline; for items not specified in the contract, the relevant provisions of this guideline may be implemented.