1. 3.7V boost to 5V (or 6V, or 9V), 2A--4A.
2. With 1-4 lights to choose from for power display, the LED will always display after power on.
3. 4.2-4.4V charging protection, overcurrent and overload p...
As an RF engineer and tester, in my daily work, in addition to test instruments, calibration parts, and connecting cables, I am most exposed to adapters. During the maintenance process, we found that ...
Since the official launch of Keysight's Open Labs Application Focus Day in 2012, Keysight's four laboratories in Beijing, Shanghai, Shenzhen and Chengdu have held more than 10 technical events for use...